United
States of America
OCCUPATIONAL
SAFETY AND HEALTH REVIEW COMMISSION
1120 20th
Street, N.W., Ninth Floor
Washington, D.C. 20036-3457
SECRETARY OF LABOR, |
|
Complainant, |
|
v. |
OSHRC Docket No. 15-1048
|
J. D. ECKMAN, INC., |
|
Respondent. |
|
Appearances: Nicholas C. Geale, Acting Solicitor of
Labor
Oscar L. Hampton III, Regional Solicitor
Andrea Luby, Senior Trial Attorney
U.S. Department of Labor, Office of the
Solicitor, Philadelphia, Pennsylvania
For the Secretary
Thomas M. L. Metzger, Esq.[1]
Bryan Gramlich, Esq.
Littler Mendelson, P.C.,
Columbus, Ohio
For the Respondent
Before: Dennis L. Phillips
Administrative Law Judge
DECISION AND ORDER
This proceeding is before the
Occupational Safety and Health Review Commission (Commission) pursuant to
sections 2-33 of the Occupational Safety and Health Act of 1970, 29 U.S.C. §§
651-678 (OSH Act). On December 3, 2014, at
approximately 11:00 p.m., a driver of a 2004 Jeep Liberty veered into Respondent’s
worksite in the westbound lanes of Route 422 (also known as Benjamin Franklin
Highway) in Pottstown, Pennsylvania, and crashed into Respondent’s
superintendent, killing him.[2] (Tr. 56; Exs. 1 at “A”, 5 at 0211, 18 (police
incident report)). The next day, the Occupational Safety and Health
Administration (OSHA) inspected Respondent’s traffic control worksite on highway
Route 422. As a result of the
inspection, OSHA issued one three-item citation to J. D. Eckman, Inc. (Respondent
or J. D. Eckman), alleging serious violations of the OSH Act and proposing a
total penalty of $21,000.
Respondent filed a timely notice of
contest, bringing this matter before the Commission. Respondent
raised the following as defenses:
1) The Complaint fails to state a claim upon which relief may be
granted. Specifically, OSHA has not met its burden of establishing that: the cited standard applies, the employer
failed to comply with the terms of the cited standard, and the employer either
knew or could have known of the violative condition via reasonable diligence.
2) The allegations in the Complaint are barred by their isolated
occurrence. The actions of the driver of the Jeep Liberty were the
sole cause of the accident.
3) The violations for which Respondent was cited are unenforceable
due to vagueness/lack of clarity.
4) Respondent has been denied due process, including, but not limited
to, being cited for failure to comply with interpretations of which they were
not given adequate notice (manuals and
publications incorporated into OSHA standards do not provide the requisite
clarity for enforcement purposes).
5) Respondent lacked the necessary knowledge of the alleged hazardous
conditions to
support a
citation.
(Answer at 5; Joint Pre-Hearing Statement
(Jt. Pre-Hr’g St.) at 10).
A hearing was held in Philadelphia,
Pennsylvania on December 1 and 2, 2016. Both parties filed post-hearing briefs. For the reasons set forth below, the Court vacates
all three of the citation items and proposed penalties.
STIPULATIONS[3]
The following statements were stipulated as facts by the parties before
trial and entered into the record at the request of the parties at trial:
1. Jurisdiction
of this action is conferred upon the Occupational Safety and Health
Administration by Section 10(c) of the Occupational Safety and Health Act.
2. Respondent,
J.D. Eckman, Inc., is a corporation that had employees setting up a traffic
control zone at approximately 422 WB Mile 171.2 in Pottstown, Pennsylvania. Respondent is, and at all times hereinafter
mentioned, was a business engaged in construction.
3. Respondent
uses tools, equipment, machinery, materials, goods, and supplies which have
originated in whole or in part from locations outside the state of
Pennsylvania.
4. Respondent
is an employer engaged in a business affecting commerce within the meaning of
Section 3(5) of the Act, 29 U.S.C. § 652(5).
5. Respondent
employs approximately 450 employees in various construction activities,
including approximately 11 employees on Route 422.
6. Beginning
on December 4, 2014, an authorized representative of the Secretary of Labor
inspected Respondent’s Worksite after Respondent notified OSHA of a fatality
that occurred at the worksite the previous day.
7. On
June 3, 2015, the Secretary issued to Respondent a Citation and Notification of
Penalty pursuant to Sections 9 and 10 of the Act. Respondent contests the
validity of the citations, classifications, penalties and abatement dates in
that Citation.
8. Respondent
filed a timely Notice of Contest with OSHA, contesting all substantive
provisions of the Citations, and the proposed penalties. The notice was duly
transmitted to the Occupational Safety and Health Review Commission.
9. On
December 3, 2014, at Respondent’s worksite, Respondent’s employees were
eradicating lines and painting additional lines to establish long-term traffic
control patterns in preparation for upcoming work.
10. At
8:30 p.m. on December 3, 2014, east bound work had been completed and west
bound work was started. In this phase,
the long term traffic pattern reduced two lanes of 422 west bound into a single
lane. The left lane would be closed to create a permanent work zone behind a
concrete barrier. A long term traffic attenuator and concrete barrier was to be
set to transition the flow of traffic. Because of this, several white dash
lines needed to be eradicated and a new tapered yellow line (left side) needed
to be painted before the concrete barrier was set. The location of this transition taper was to
be established just west on the ramp from Route 100 south.
11. Before
this long term pattern had been set up, Respondent’s employee, [the decedent][4], was
struck by a vehicle. [The decedent] died
from the injuries that he suffered from this collision.
(Jt. Pre-Hr’g St. at 6-8; Tr. 20).
JURISDICTION
The record establishes that, at the time of the fatal incident, Respondent was setting up a traffic control zone in the west bound lanes
of Route 422 in Pottstown, Pennsylvania in preparation for a bridge
construction project. (Stipulations (Stip.)
at ¶ 2; Tr. 20). The record also establishes that Respondent had eleven
employees working on the Route 422 project and employs approximately 450
employees in various construction activities overall. (Stip,
at ¶ 5; Tr. 20, 37). The
construction industry as a whole affects commerce, and even small employers
within that industry are engaged in commerce.
Slingluff v. OSHRC, 425 F.3d 861, 866-67
(10th Cir. 2005); Clarence M. Jones, d/b/a C. Jones
Co., 11 BNA OSHC 1529, 1531 (No. 77-3676,
1983). Additionally,
Respondent filed a timely notice of contest and admits that, as of the date of
the alleged violations, it was an employer engaged in business affecting
commerce within the meaning of section 3(5) of the OSH Act. (Answer at ¶¶ 3, 4; Stip. at ¶ 4; Tr. 20).
Based upon the record,
the Court finds that at all relevant times Respondent was engaged in a business
affecting commerce and was an employer within the meaning of sections 3(3) and
3(5) of the OSH Act. The Court concludes
that the Commission has jurisdiction over the parties and subject matter in
this case, and Respondent is covered under the OSH Act.
OSHA CITATION
Citation 1,
Item 1 alleges a serious violation of section (5)(a)(1), the “general duty clause,”
of the OSH Act and proposes a $7,000 penalty.[5] The Secretary claims that Respondent violated
the general duty clause because Respondent:
did not furnish employment and a place of employment
which were free from recognized hazards that were causing or likely to cause
death or serious physical harm to employees in that the employer failed to
protect employees from vehicle strikes by not establishing a safe temporary
work zone.
(Citation at 6). The Secretary further claims that at:
422 W, mile marker 171.2 – On or about 12/3/2014, the
employer created a dangerous work zone by placing traffic control devices at
120 foot intervals instead of the required 40 foot intervals. The employees were not protected from vehicle
strikes.
(Citation at 6). As a means of abatement, the Secretary
proposed that “[a]mong other methods, a feasible and acceptable means of
abatement would be to comply with PA Pub. 213 for proper placement of traffic
control devices.”[6] (Citation at 6).
Citation 1, Item 2 alleges a serious
violation of 29 C.F.R. § 1926.202/Manual of Uniform Traffic Control
Devices (MUTCD) 1988 Edition, Section 6F-8(a)(2) and proposes a $7,000 penalty.[7] The Secretary claims that Respondent violated
the cited standard because:
Barricades for protection employees did not conform to
the portions of the American National Standards Institute D6.1-1971, Manual on
Uniform Traffic Control Devices for Streets and Highways, relating to
barricades, in that employees were not protected while placing temporary
traffic control devices.
(Citation at 7). The Secretary further claims that at “422 W,
mile marker 171.2 – On or about 12/3/2014, the employer did not ensure a truck
mounted attenuator (TMA) was used to protect employees placing temporary
traffic control devices near moving vehicles.”
(Complaint at 7).
Citation 1, Item 3 alleges a serious
violation of 29 C.F.R § 1926.200(g)(2)/MUTCD 1988 Edition, Section 6C-3, and
proposes a $7,000 penalty.[8] The Secretary claims that Respondent violated
the cited standard because:
Traffic control signs or devices used for protection
of construction workers did not conform to Part VI of the Manual of Uniform
Traffic Control Devices (MUTCD), 1988 Edition, Revision 3 in that the employer
did not provide a roadway transition taper of the requisite length to ensure safe
vehicle routing around the temporary work control zone.
(Citation at 8). The Secretary further claims that at:
422 W, mile marker 171.2 – On or about 12/3/2014, the
employer did not establish a transition taper for the temporary traffic control
zone to endure safe vehicle routing and that was incompliance with Table VI-2
of the MUTCD, 1988 Edition, Revision 3.
The employer’s installed taper was approximately 120 feet in length
which was much shorter than the approximately 300 feet required by Table VI-2.
(Citation at 8).
INFLUENTIAL ISSUES OF FACT AND LAW
For convenience purposes, the Court
states up front that the following issues of fact and issues of law are found
to have the most influence on the analysis of the citation items in this
case.
The most influential issues of fact
include:
1) Did the Secretary establish the precise traffic cone
spacing of the straightaway[9]
and the length of the transition taper, as alleged in Citation 1, Items 1 &
3, while Respondent was working (not after the incident)? The Court finds that he did not.
2) Did the Secretary establish that Respondent used a TMA
on its worksite with the purpose of being a TMA at the time of the incident, as
alleged in Citation 1, Item 2? The Court
finds that he did not.
The most
influential issues of law include:
1) Did the Secretary establish that the traffic cone
spacing of the straightaway was part of a hazard, as defined by Commission
precedent, for the alleged general duty clause violation as cited in Citation 1,
Item 1? The Court finds that he did
not.
2) Are the provisions of the MUTCD that are referenced in
Citation 1, Items 2 and 3, mandatory, as defined by 29 C.F.R. § 1926.6(a)[10] (which
is incorporated by reference in the cited standards in Citation 1, Items 2 and
3)? The Court finds that these
provisions of the MUTCD are not mandatory.
BACKGROUND
Schuylkill Project
Respondent is a bridge and highway construction
company working primarily in Pennsylvania.[11] At the time of the incident, Respondent was
under contract with the Pennsylvania Department of Transportation (PennDOT) to,
among other things, repair a bridge over the Schuylkill River along Route 422
near Pottstown, Pennsylvania. (Ex. 4 at
5 (Respondent’s contract with PennDOT)).
The worksite at issue here was located on the west-bound lanes of Route
422 around mile marker 171 leading up to the Schuylkill River when heading west.
(Tr. 36-39, 71-72; Exs. 5 at 1, 15 at 1).
Before Respondent could begin working on the bridge over the Schuylkill,
Respondent had to create this worksite on Route 422. To create this worksite, Respondent had to
implement a long-term traffic control pattern that was developed by PennDOT and
incorporated into Respondent’s contract with PennDOT. This long-term traffic control pattern would
allow traffic to approach the bridge over the Schuylkill and cross it, while
work was being done “in a permanent work zone” on Route 422. (Respondent’s Brief (Resp’t Br.) at 2).
To establish the long-term traffic
control pattern, however, Respondent first had to prepare Route 422 for the
changes, i.e., remove the existing
“dash” lines on the road and paint new lines on the road to convey to another
subcontractor where to place the “long-term traffic control” Jersey barriers
the following day. On the night of the
incident, Respondent was engaged in this work, using a “short-term” traffic
control pattern. Because the “long-term”
Jersey barriers were not on the road yet, Respondent’s workers on Route 422 in
the late-night hours of December 3, 2014, relied on “temporary” traffic control
measures to designate its work area in the left-hand lane from the still
flowing traffic in the right-hand lane on west-bound Route 422.
The differences between the “long-term”
traffic control measures and the “short-term” traffic control measures are
relevant to this case. Both used the
warning signage put in place well before the work zone. Both used an illuminated arrow sign in the
transition taper[12] to
alert travelers to the lane shift from two lanes to single lane traffic. However, the “long-term traffic control plan”
would utilize concrete Jersey barriers to protect the bridge construction
worksite.[13] (Resp’t Br. at 2). The “short-term traffic control plan,” which
existed on the night of the incident, utilized traffic cones that were not
permanent and easily moved by a single worker.
(Tr. 128-29). These traffic cones
were stackable, “rubberized, bright orange with two stripes of reflectorization
on them.” They were approximately 30
inches high and weighed about 12-20 pounds each. (Tr. 128-29).
The decedent, age 60, was the lead
superintendent of the worksite at issue here.
According to the record, the decedent had been called in from vacation
on the day of the incident to help the other Respondent superintendents at this
worksite, Dave Gardner and Robert Schaeffer.
Additionally, a foreman from another one of Respondent’s Route 422
worksites (also contracted with PennDOT), Randy Ruof, was sent that day to help
with the project at issue here.[14] (Tr. 39).
As a superintendent, the decedent was above foreman Ruof “in the chain
of command.”[15] (Tr. 37-38).
Juan Villasenor was driving the Ford
pattern truck with a TMA attached on the night of the incident.[16]
(Tr. 271-72, 276). The record shows the Ford pattern truck was
used to set the cones on the roadway on December 3, 2014. (Tr. 46, 77, 105-06, 367-68).
Worksite Description
The worksite at issue was located
within the westbound lanes of Route 422 around mile marker 171.[17] Starting at about two miles to the east of
mile marker 171 were advance warning signs providing notice to travelers that
the lanes of westbound Route 422 would be shifting from two lanes to one lane,
with the left lane closing.[18] (Tr. 44, 254-55 identifying Ex. 13[19]
at counter 17-19 seconds). Leading up to
approximately mile marker 171, Respondent set up a transition taper consisting of
rubberized orange cones that had the purpose of closing off the left-hand
lane. (Tr. 311-13 identifying Ex. 13 at counter
39-40 seconds, 390 identifying Ex. A at counter 2 minutes, 25 seconds). The first cone at the beginning of the taper was
adjacent to the roadway’s guardrail.
(Ex. A, at counter 2 minutes, 27/28 seconds). There was also an arrow board owned by
Respondent situated in the left-hand shoulder.[20] (Tr. 75, 91-92; Exs. 3 at 1 [Top Photograph
at “A”], 9, 13 at counter 45 seconds). The
length of this transition taper is at issue in Citation 1, Item 3.
The travelling traffic, as a result,
continued along the right-hand lane of westbound Route 422. Running between this dead lane and active
lane of traffic was a line of traffic cones set on or near the dashed lines of
Route 422.[21] (Tr. 97, 259; Exs. 9 at 3, 13 at counter 49
seconds). The spacing of these cones in
this straightaway is at issue in Citation 1, Item 1.
With regard to Citation 1, Item 2,
the focus is on the evidence surrounding TMAs.
At the time of the incident, Respondent was preparing the dead lane of
traffic to be permanently demarcated by Jersey barriers from the active lane up
to and over the Schuylkill River, which was approximately a mile west along
Route 422. It was OSHA’s Compliance
Officer (CO) Edwardo[22] Santiago’s
understanding, based upon Ruof and Gardner, that Respondent had a truck with a TMA
parked alongside Detective Thomas Barton of the North Coventry Township Police
Department (NCTPD) away from Respondent’s operations inside the pattern, while another
pattern truck with a TMA was en route,
“doing the loop around,” from the west-end of Respondent’s operations back to
the east end of Respondent’s operations.
(Tr. 235, 371). The Court finds
that the record establishes that Respondent had a Ford pattern truck with a TMA
“doing the loop around,” and was thus not located within the worksite cordoned
off by the traffic cones at the time of the incident.
The location of a second truck with a
TMA alleged by CO Santiago is, at best, not clear based on this record. With regard to this alleged second TMA, the
Court first finds that there is insufficient evidence in the record to
substantiate that another vehicle with a TMA (Peterbilt or otherwise), other
than the Ford pattern truck with a TMA, was actually present at the worksite during
the evening of December 3, 2014.
Although Mr. Villasenor was identified as the driver of the Ford pattern
truck with a TMA, no driver was identified as having driven a non-pattern truck
with a TMA that day at the worksite. No
driver of a vehicle with a TMA testified at trial. Detective Barton does not recall seeing a
vehicle with a TMA other than the Ford pattern truck with its TMA at the
worksite that evening. Ruof’s March 2015 diagram depicting the placement of two
pattern trucks at the worksite is unreliable.
No pattern truck was parked alongside Detective Barton and Officer Tim Roeder
at the South Keim Street ramp at the time of the incident. As to any second truck with a TMA, CO
Santiago testified that “it is not certain of its location”, and due to
“interchangeable terms,” he was “not sure on the location of the TMA.” (Tr. 277, 371, 406-07). No TMA of any kind is in the pictures and
videos taken at the worksite on the night of the incident. (Exs. 3, 13, A, E).
The Court further finds that CO
Santiago’s account that Gardner told him that a pattern truck with a TMA was
located in the transition area at the time of the incident was in error, or Mr.
Gardner was in error in making such an assertion to him, or CO Santiago was
confusing the Ford pattern truck with a TMA with another, non-pattern truck with a TMA. Gardner arrived at the worksite only minutes
before the incident, and he did not testify at the trial. (Tr. 271-77).
It is undisputed that the Ford
pattern truck with its TMA was not located where CO Santiago claims it should
have been located – within the pattern zone to the east of Respondent’s
operations near the arrow board to serve as protection of Respondent’s workers
from errant vehicles. (Tr. 371-72; Ex. 9
at 1 at “E”). The Court finds that the
Ford pattern truck with its TMA was not in the transition area at the time of incident,
but was, instead, “looping around” back onto Route 422 east. (Tr. 271-77).
The existence and location of any second truck with a TMA at the worksite is a subject at issue for Citation 1, Item 2. Under these circumstances, the Court finds that the record does not support that there was a second TMA on the worksite on the night of the incident.
Events
on the Evening of December 3, 2014
3:00 P.M.-8:30 P.M.
The parties stipulated that the work
Respondent was performing that night was eradicating existing road lines and
painting new lines, to aid the travelling public to navigate around the
worksite leading up to the Schuylkill River.[23] (Stip. at ¶¶ 9-10). Ruof testified that Respondent had already
performed the eradication task before he arrived at the worksite that day
around 3:00 p.m. (Tr. 41, 63). Work continued late into the evening because
the tasks for that day had to be completed before the following day’s scheduled
delivery of concrete Jersey barriers.
(Tr. 80, 151). By 8:30 p.m.,
Respondent had completed the east-bound work on Route 422 and started the west-bound
work. (Stip. at ¶ 10).
8:30 P.M.-10:30 P.M.
One of the initial tasks on the
west-bound lanes was to perform a “slow roll,” to establish traffic
control. The “slow roll” procession had
the purpose of protecting the work vehicle performing a task: the lead vehicle, typically termed a pattern
truck, would be performing a task, while one or two other vehicles trailed
behind it slowing down traffic behind them.
Detective Barton, along with West Pottsgrove Officer Tim Roeder,
would help with this travelling roadblock.[24] (Tr. 285-287, 307-08). During the “slow rolls,” Detective Barton
helped slow or stop traffic by hitting his breaks and weaving back and forth in
a zig zag pattern at a speed of about ten to fifteen miles per hour. (Tr. 296-97). Traffic would react and follow Barton into the
right lane, upon which Barton would increase his speed to that of the posted
speed limit. (Tr. 292, 297). Traffic would continue following Barton
through the pattern at a slow pace, thus creating a time gap for the pattern to
be set out. (Tr. 292, 297).
Following the “slow roll,” Detective Barton
pulled into the dead lane of the pattern on the west-end of the workers and remained
there awaiting receipt of his next set of directions from the decedent for
providing control over the traffic that was still flowing in the right lane. (Tr.
294). After his receipt of
instructions, Detective Barton would “loop around” the worksite to begin
another “slow roll” at the east end of the worksite. The “loop around” was the term used at the
trial to describe how workers would return to the worksite once finishing a
task travelling westbound on Route 422: “Well,
the traffic is running westbound. Every
time we did something, whatever it may be, you set – if you set signs, you have
to continue, get off the highway, turn around, come back, then do you next
thing.” (Tr. 69). The record indicates the “loop around”
constituted the following:
(1) Driving west on Route 422, over the Schuylkill, and
exiting Route 422 at the Stowe exit,
(2) Traveling east to one of the onramps east of the Routes
100 and 422 intersection, and then,
(3) Re-entering Route 422 westbound east of the worksite.
(Tr. 70, 124-25, 344; Ex. 1).
According to Schaeffer, PennDOT
dictated the terms of a “slow roll.”
(Tr. 195). For example, Schaeffer
testified, “when we do the slow roll, we’re allowed to actually stop traffic
for 15 minutes, but they say you can only do the slow rolls at certain times on
that side of the road,” taking into account factors such as time of day,
weekends, holidays, etc. (Tr. 195). During the time gaps created by each “slow
roll,” Respondent’s crew worked to quickly complete their tasks. (Tr. 292).
For example, during the first “slow roll,” cones were put out to mark
the road closure and the lane change from the left lane to the right lane. (Tr. 292).
Ruof testified that a second truck with
a TMA that he alleges was at the worksite was “strictly a TMA”; i.e. a truck providing protection to
workers. (Tr. 77).
Ruof differentiated this alleged second truck with a TMA from the Ford
“pattern truck,” that carried cones on it and also had a TMA on it. He said that the Ford pattern truck was used “to
facilitate cones and signs.” (Tr. 77).
At approximately 10:00 p.m., Barton departed
his parked position in the left-hand lane on Route 422 to “loop around” and
perform another “slow roll.” (Tr. 358). After looping around, Barton parked eight-tenths
of a mile east of the worksite on the South Keim Street onramp facing westbound
with his lights activated. (Tr. 298,
307). Parked next to Barton was Officer
Roeder in his marked West Pottsgrove police car. (Tr. 307-08).
They waited for word to depart this waiting spot on the South Keim ramp
to perform a “slow roll” with the paint truck.[25] (Tr. 353).
The following was Detective Barton’s
understanding of what the pattern truck with a TMA was instructed to do right
before the incident occurred:
Q Did you feel that you had a clear
understanding of movement of cones, while the painting activity was going on?
A Yes, generally I did.
Q Okay. And what did you understand
that to be?
A That the operation between the
paint truck and where the taper was to start the painting on the roadway had to
be done somewhat by hand, and that required cones that were already on the skip
line to be moved to allow for the size of the vehicle doing the painting to
accomplish their task. I also understand from my interviews that the presence
of the [Ford] attenuator truck had traveled into the pattern, far beyond where
it was intended to be through the direction of what [the decedent] had
indicated for the other employees at that time. So they suspended with the
painting operation, to allow the [Ford] attenuator truck to again loop the
pattern and come back and sit at the right point to officially stop traffic, so
that the rest of the painting operation could be completed.
Q And did
you understand that the [Ford] attenuator [truck] would be behind the paint
truck, as it traveled through the live lane of traffic, which is when you would
be also doing your slow roll?
A Correct.
(Tr. 352).
10:30 P.M.-11:00 P.M.
Cones
were in place and a traffic control pattern established by about 10:30 p.m. Superintendent Schaeffer testified that he
finished painting the reference lines for the “end of the traffic pattern”
around 10:30 p.m. (Tr. 171-75; Ex. E at
1 at “A”, 2 at “A” and “B”). Schaffer
then testified that he saw the cones “in place in perfect order before [he]
left.” (Tr. 176). Schaffer said he left the worksite about 45
minutes to an hour before the incident. (Tr.
201).
Between 10:00 p.m. and 11:00 p.m., the
paint truck was sitting in the left lane at the end of the taper, inside the
traffic pattern. (Tr. 76, 88; Ex. 9). The decedent had been speaking with the
painters in that truck and gave them the go-ahead to “loop around” and prepare
to paint the final striping.[26] (Tr. 88, 123). During this time, traffic had been moving in
the right-hand lane. (Tr. 124).
Around this time, Ruof saw the
decedent starting to re-position traffic cones; one at a time. (Tr.
66, 129; Ex. 9 at “B”). The decedent,
who was on the west-end of Respondent’s operations, called Ruof, who was near
the transition taper, using a cell phone and told Ruof to “go ahead and let the
traffic through.”[27] (Tr. 81-82).
Ruof later testified that the paint truck did not move prior to the
incident, that “they didn’t get to go anywhere.” (Tr. 123-24).
Ruof also then agreed to the following:
Q: The policeman
and the attenuator truck had already gone around at that point in time?
A: Yes.
Q: They were just
waiting for the paint truck at that point in time?
A: Yes.
(Tr. 124).
During this time, Superintendent Gardner
approached Ruof. (Tr. 66). While Ruof and Gardner were conversing behind
Gardner’s pickup truck, Ruof heard a noise and thereafter noticed that the
decedent had been struck by a moving vehicle at the west-end of the taper. (Tr. 66, 76-77; Exs. 1 at “D”, 9 at “A”). Ruof estimates that the decedent had moved
three or four cones before being struck. (Tr. 126).
One of the two laborers who had been helping the decedent move the cones
was struck by a cone that may have been initially in the decedent’s hand. (Tr. 127).
According to CO Santiago, at the time
of the incident the Ford pattern truck with a TMA was “looping around,” “in
motion” and “fluid.” (Tr. 276, 368; Ex.
9 at “D”). CO Santiago also said it was
his understanding that an alleged second pattern truck with a TMA (perhaps a
Peterbilt truck) was parked “inside the work activity area,” to the west of the
workers. (Tr. 276-77, 368; Ex. 9 at
“C”). Detective Barton recalled seeing
the Ford TMA, but not a Peterbilt truck with a TMA, at the worksite during the
night of the incident. (Tr. 300). Detective Barton also testified that he “was
familiar with [] a Ford stake body truck with a crash attachment that the cones
were on”; “the F-650 cone truck, pattern truck with attenuator.” (Tr. 299-300; 349-50). Detective Barton did not know and could not
recall if a Peterbilt truck with a TMA was “there,” referring to the worksite
on the night of the incident. (Tr.
348-50; Ex. 9). Detective Barton stated
that he was waiting with Officer Roeder for the Ford “pattern truck” to pass
him to begin another “slow roll.” (Tr.
307-08). The Ford pattern truck with a
TMA had not passed him yet when the incident occurred. (Tr. 307-08).
At approximately 11:00 p.m., Detective Barton received a radio dispatch
from Montgomery County Police Radio that there were reports coming in of a
worker struck on the highway west of Route 100. (Tr. 308).
RELEVANT TESTIMONY
CO Edwardo Santiago
CO Santiago testified regarding his
inspection of Respondent’s worksite.[28] He was assigned to investigate the worksite
on December 4, 2014[29],
the day after the incident.[30] He was instructed to go to the jobsite and
document the working conditions.
(Tr. 237). CO Santiago was not “the traffic control
coordinator for the Philadelphia area office,” and does not have “any
specialized knowledge regarding traffic control programs or requirements.” (Tr. 397).
He cannot say with certainty that he is “familiar with the fact that
[OSHA Instruction, Directive Number: CPL
02-01-054, Subject: Inspection and Citation
Guidance for Roadway and Highway Construction Work Zones] identifies that only
mandatory provisions of the MUTCD are to be issued as citations.” (Tr. 396-97).
When CO Santiago arrived at the
worksite, the worksite had been cleared from the highway. (Tr. 243-44).
He came upon Mr. Shaeffer, who was “in the vicinity.” He showed him his OSHA credentials. He spoke with him “in an area inside the
shoulder,” where Respondent “had located their construction equipment and
vehicles.” (Tr. 190-91, 238-39). CO Santiago took a video from the eastbound
side of Route 422, looking east. (Tr.
240; Ex. 8). The video shows
free-flowing traffic on the other side of the guardrail, where the worksite had
been the night before. (Ex. 8). According to CO Santiago, Mr. Schaeffer
seemed “pretty shaken up,” so CO Santiago “kept [his] conversations with him
brief.” (Tr. 403). Mr. Schaeffer pointed out the location where
the decedent was struck and killed. There
were no traffic cones or TMAs for CO Santiago to inspect.[31] (Tr. 242-43; Ex. 8). CO Santiago did not ask Mr. Schaeffer that
day why the worksite had been removed. Mr.
Schaeffer did not show CO Santiago “anything that could have been measured to
determine the way that the traffic control pattern was set out the night
before.” (Tr. 244, 402). CO Santiago, however, testified that he had
“no reason to believe that someone removed [the worksite] just so [he] couldn’t
conduct an inspection.” (Tr. 402). After his interview, Schaeffer referred CO
Santiago to Respondent’s Safety Director
Robert Wittlinger. (Tr. 191).
CO Santiago interviewed Mr.
Wittlinger by telephone on the day of the inspection, December 4, 2014. (Tr. 260).
CO Santiago asked Wittlinger about Respondent’s Traffic Control Plan (TCP).
He did not recall asking Wittlinger
about PA Pub. 213.[32] (Tr. 261; Ex. 10). Wittlinger provided CO Santiago with
Respondent’s TCPs and indicated to CO Santiago that Respondent was in “stage
one, phase B” of the project on the night of the incident. (Tr. 261-62; Ex. 2).
To gather additional evidence, CO
Santiago explained: “Being that I had
nothing to work with, in that there was no worksite where the accident had
occurred, I knew from my experience that the local police department would have
– that was dispatched to the scene would have details on the incident.” (Tr. 243).
CO Santiago contacted the NCTPD and spoke with lead investigator
Sergeant Robert W. Malason. (Tr. 244;
Ex. 18 at 14).
CO Santiago acquired the NCTPD investigative
report. (Tr. 244; Ex. 5). He used this investigative report in the
following ways: “To learn of the
observations made by Sergeant Malason and the other police officers, the
statements provided to them from the witnesses at the scene of the accident,
including information from the driver involved in the incident.” (Tr. 245-46).
CO Santiago also acquired the NCTPD Incident Report.[33] (Tr. 246; Ex. 18).
CO Santiago also acquired “dash-cam”
videos from at least two police vehicles responding to the incident. (Tr. 254, 386-90; Exs. 13, A). He used these videos to ascertain what the
worksite looked like on December 3 after the incident. He used the videos to show the location of
Respondent’s traffic cones, which, in turn, CO Santiago attempted to use to
discern the length of the transition taper, and the spacing of the cones along
the straightaway at the worksite on the night of the incident.[34] (Tr. 255-60, 381, 386-96). The Secretary, however, states the following:
“Some cones dividing the right lane from
the left lane had been moved after the accident to make room for first
responders, [Tr. at 90, 98], and so the dash cam video does not provide
reliable evidence about the spacing of those cones.” (Sec’y Br. at 7). Regarding the length of the taper, however,
the Secretary still relies on CO Santiago’s testimony regarding the Parfeniouk video
at Exhibit 13.[35] (Sec’y Br. at 17 citing Tr. 375 (CO Santiago referring
to pictures in Exhibit 3, which are stills from Exhibit 13)).
CO Santiago returned to the location
of the worksite on December 8, 2014.
(Tr. 264). At that time, CO
Santiago took pictures of Respondent’s traffic control equipment that was at
the worksite on December 8, 2014, including pattern trucks. (Tr. 264-66; Ex. 9 at 2-5). The trucks at the work site on December 8th
included a Ford and a Peterbilt – both of these trucks had a TMA on them. The Ford truck is shown in photographs at Exhibit
9 at 3, 5. The Peterbilt truck is shown
in the photograph at Exhibit 9 at 4. CO
Santiago testified: “Without looking at
the pictures I can tell you that the Peterbilt was the TMA and the Ford was the
Pattern truck, based on my interviews.”
(Tr. 267; Ex. 9 at 3-5). CO
Santiago did not testify that these two trucks were used at the worksite on
December 3, 2014 at the time of the incident.
That day, December 8th, CO
Santiago also interviewed Superintendent Gardner. (Tr. 267).
He told the CO that he saw the decedent adjusting cones just prior to
the incident. He said the cones were 4
feet inside the left-hand lane from the centerline of the highway. According to CO Santiago, Gardner was a direct
eye witness to the incident.[36] According to CO Santiago, Gardner saw a Jeep
leave the right-hand travel lane and enter the left-hand working lane and
strike the decedent as he was adjusting cones in the worksite
straightaway. (Tr. 268-70). Regarding the location of Respondent’s trucks
on the worksite at that time, CO Santiago testified that Gardner told him that a “pattern truck was inside that transition
area [i.e., the taper] and the TMA was looping around [i.e., leaving and
returning to the jobsite].” (Tr. 270). CO Santiago testified that Gardner said that
Juan Villasenor was driving the Ford truck that night and was looping around
back onto 422 east at the time of the incident.
(Tr. 271-72, 276-77). CO Santiago
then testified:
A
The two trucks that were used, one was driven by Juan Velasenor (sic), which
was being looped around, which was the Ford truck. The Ford truck, as I understand,
was the pattern truck, not used as a TMA. And the other truck was used as the
TMA. And I can’t say with certainty where that TMA was located, without
referring to my notes.
Q Okay. So we’re not sure on the location of --
A No, it --
Q -- the TMA at this point?
A Correct.
Different personnel -- being that these trucks were identified interchangeably
with pattern truck, TMA and crash truck, it made it difficult to discern that
definitively.
(Tr.
277).
In March 2015, three months after the
incident, CO Santiago interviewed Foreman Ruof regarding the worksite. (Tr. 272).
CO Santiago testified that Ruof told him that “the cones had been placed
on every third skip once the line was straight,” and that the cones in the
taper “were somewhere between 6 and 12 feet apart.”[37] (Tr. 259).
Ruof told the CO that the length of the taper was “600 plus feet.” (Tr. 273-74).
CO Santiago testified the Ruof said that Respondent had placed the cones
about 1 hour and 45 minutes prior to the incident.[38] (Tr. 273).
CO Santiago conducted a closing conference
with Mr. Wittlinger. (Tr. 365,
412). He informed Wittlinger that he had
decided to cite Respondent for “[t]he failure to protect the construction
workers while conducting their construction activities. The taper not set up according to the MUTCD
and the spacing – the spacings of the pattern being set too wide.” (Tr. 365).
CO Santiago testified that Citation
1, Item 1, the alleged straightaway cone spacing violation, was based on “witness testimony and
the North Coventry Police Department dash-cam video.” (Tr. 365-66).
CO Santiago relied on Ruof telling him that the cones were placed “every
third skip.” (Tr. 366). CO Santiago used Sergeant Malason’s
measurements to determine the spacing between the cones in the following
manner: each skip was 10 feet long, and
each skip was 30 feet apart. (Tr. 256-57,
366). Using these measurements, and
Ruof’s statement that each cone was placed “every third skip,” CO Santiago said
he determined that each cone was placed “approximately” 120 feet apart. (Tr. 366).
CO Santiago agreed that Respondent recognized “the hazard of employees
being struck by oncoming traffic” and testified that it was evident “in the
manner they used their – the equipment, specifically the pattern truck, the
TMA.”[39] (Tr. 367).
With regard to Citation 1, Item 2, CO
Santiago testified that Respondent did not comply with MUTCD Section 6F-8(a)(2)
Other Devices – Truck-Mounted Attenuators.
(Tr. 369-70; Ex. 11 at 21). CO
Santiago testified that, in order to comply with the MUTCD section, “the TMA
truck would – in order to function as designed, would need to be positioned
east of the workers.” (Tr. 370-72; Ex. 9
(alleged required location marked with letter “E”)). On cross examination, CO Santiago admitted
that MUTCD Section 6F-8 states that “[t]rucks and trailers are often used” and
does not say that they must be used. He
also admitted that the section states TMAs can be attached to the rear of
protective vehicles; it does not say TMAs must be used. He further admitted that the section states
that if a vehicle is used as a protective truck it must be positioned
sufficiently ahead so that it does not roll into employees; it does not state
that protective trucks must be used. (Tr.
397-99; Ex. 11 at 20-21).
CO Santiago testified that both the Ford
pattern truck and the second truck with a TMA that he alleged was at
Respondent’s worksite were not functioning as TMA’s because one (the Ford) was
“doing the loop around. So it was not
used to protect the workers who are actively moving cones.” (Tr. 371).
As to the other alleged truck with a TMA, supposedly a Peterbilt, he
said “it is not certain of its location, but from information that I gathered
during my interviews it was inside the pattern.
And there are other indications that it was parked a distance away from
the actual work zone.”[40] (Tr. 270, 371). CO Santiago testified that he did not ask why
a pattern truck was not placed to the east of the employees because:
When I
interviewed the employees, I was not at a position where I learned of the issue
of the pattern truck. So that wasn’t in
my head to ask questions. When I was
interviewing them I wanted to know what they knew of the accident and where the
pattern trucks were. Their
locations. Because at that point I had
no idea. I was just learning information
for the first time.
(Tr. 406-07).
When shown the diagram Ruof drew in March
2015, at Exhibit 9 at 1, CO Santiago admitted “[t]here is no indication here of
workers conducting construction activities, but the TMA truck would – in order
to function as designed, would need to be positioned east of the workers.” (Tr. 371-72; Ex. 9 at 1). CO Santiago stated that a truck with the TMA
should have been positioned within the traffic control zone east of the paint
truck and west of two pickup trucks “somewhere between the paint truck and the
end of the taper, where the taper meets the first skip line.” (Tr. 372; Ex. 9 at 1 at “E”). It is undisputed that no TMA was
positioned at that location at the time of the incident.
CO Santiago testified that the basis for
the alleged TMA violation, was because Respondent did not use a truck with a TMA,
which CO Santiago understood to be a Peterbilt truck, “in a way that protected
the workers conducting the construction activity.” (Tr.
367-68). CO Santiago testified to
the following: “We have construction
activity occurring in between two vehicles with attenuating devices, both of
which are not in any position to function in any protective means.” (Tr. 368).
CO Santiago testified that he had “received information, during my
interviews, that there was a pattern truck inside the pattern or the taper and
there was another one in the process of conducting a loop from the westbound
side, to the eastbound side, back to the westbound side.”[41] (Tr. 369).
CO Santiago testified that Gardner told him that the “TMA” was looping
around and that the “pattern” truck was in the taper.[42] (Tr.
270). Ruof testified that the
pattern truck could have a “dual-purpose” of both “setting pattern [placing
cones] and as a TMA.”[43] (Tr. 104).
CO Santiago said that the [Ford] “pattern truck was a dual purpose
vehicle … It was equipped with the means to aid in the setting up of a pattern
and to absorb the impact of errant vehicles.”
(Tr. 407).
CO Santiago testified that the basis for
Citation 1, Item 3, the alleged transition taper length violation, was that the
length of the taper of Respondent’s worksite fell short of what should have
been approximately 300 to 320 feet.[44] Based on “visual evidence provided, seen in
the North Coventry Police Department dash-cam video and the measurements
provided by Sergeant Malason,” CO Santiago approximated the taper length on the
night of the incident as being only 120 feet.
(Tr. 374-75, 389; Exs. 3 at 1, 12 at 4, 13, A). Using the dash-cam video at Exhibit A and the still
photograph at Exhibit 3 at 2 [bottom photograph] taken from the video at
Exhibit 13, he calculated at trial that the distance from the last cone shown
at Exhibit A, counter two minutes, 27 seconds, and the first cone of two cones
circled at “B” on Exhibit 3 at 2 [bottom photograph] taken from the video at
Exhibit 13 to be 160 feet. He testified
that he was “not positive” that the two cones shown at Ex. 3 at 2 at lower
photograph at “B” were the first cones located at the roadway center line. The Court is also unable to discern whether
or not the two cones at Exhibit 3 at 2, bottom photograph, at “B” are the first
cones located at the center line; or at the end of the taper. There are gaps shown on that photograph and
in the videos at Exhibits 13 and A, both before and after these two cones.[45] Both the videos at Exhibits 13 and A and the
photograph at Exhibit 3 at 2 [bottom photograph] taken from the video at Exhibit
13 were taken after the incident, after cones had been thrown and removed from
the taper. The Court gives little or no
weight to CO Santiago’s courtroom calculation that the taper was 160 feet
long. (Tr. 388-96; Exs. 3 at 2 [bottom
photograph], 13, A). CO Santiago took no measurements at the
worksite, including of any painted markings by Schaeffer on the roadway. (Tr. 166-75, 377).
During cross examination, CO Santiago
admitted that MUTCD Section 6C-3 TAPERS states that tapers may be used in both
transition and termination areas; and agreed the section does not say tapers
must be used.[46] (Tr. 399; Ex. 12 at 4). He further agreed that the project’s TCP did
not have any provisions that related to the temporary traffic control used to
set up long term traffic control. (Tr.
401; Ex. 2).
Regarding penalty, CO Santiago testified
that OSHA considered Respondent’s size (over 400 employees – medium to large),
history (none), and gravity. (Tr.
377-79). He testified that the more
people exposed the more likely that an injury, incident, or fatality could
occur. (Tr. 379). CO Santiago testified that Respondent “fully”
cooperated with him during the course of his inspection. (Tr. 402).
He testified that there was “no reason” he did not mention good faith during
his testimony on direction examination regarding penalty, that the Area Director
determines the penalty, and he did not know if good faith was considered in the
penalty phase. (Tr. 403). He testified that OSHA did not issue any
citations to Guidemark, Inc. (Tr.
404-05).
Foreman Randy Ruof
Randy Ruof, a foreman for J. D. Eckman,
has been employed with the company for a total of 12 years. (Tr. 34-35). On the day of the incident, Ruof arrived at
the worksite sometime between 3:00 p.m. and 3:30 p.m. It was his understanding that December 3, 2014
was the first day Respondent worked on the westbound site of the project to
repair the bridge that crossed the Schuylkill River near Pottstown,
Pennsylvania. (Tr. 39-41). Respondent was in the process of starting to
work on the permanent closure (through use of Jersey barriers) of the left,
westbound lane of Route 422 about a mile east of the bridge that crossed the
Schuylkill River. (Tr. 72; Ex. 1). Ruof testified that he had “responsibility
for employee safety at the worksite,” but later clarified that everyone is
“equally responsible” for employee safety, including the employees themselves. (Tr. 35, 53-54). The decedent, as a superintendent and traffic
expert, was above Ruof in the chain of command. (Tr. 37-38, 121).
Ruof was asked to come to the
worksite to “help out” with the eradication and painting of lines and setting
up the traffic control pattern. He was
there primarily to set up the pattern to get the Jersey barriers up. (Tr. 41, 72).
The Jersey barriers were due to be placed on the roadway at the worksite
on December 4, 2014. (Tr. 122, 151-52). The TCP has four areas: advance warning, transition, activity, and
termination.[47] (Tr. 114, 139-40; Ex. 14). The traffic control pattern setup includes,
but is not limited to, cones, temporary signage,[48] pickup
trucks for arrow boards, and a TMA. (Tr.
41-43). The cones, which were rubberized
and bright orange in color with two reflective stripes, were about thirty
inches in height and about twelve to twenty pounds in weight. (Tr.
128-29). To create the traffic
control pattern, workers use a pattern truck, which displays additional signage
and carries the cones to be placed. (Tr.
46). The pattern truck used on December
3, 2014 to deploy cones was also equipped with a TMA.[49] (Tr. 46). Ruof testified that there was also a second truck
“known as the TMA” and “[t]hat’s all that does” at the worksite.[50] (Tr. 46).
After a delay due to light rain,
workers began setting up the traffic control pattern by posting temporary
signage. (Tr. 43-44, 59-60). Examples of temporary signage are a lane
closure sign, a merge sign, and a flashing arrow board. (Tr. 44). Because signage is often too large in size to
be placed in the median along the left lane, signage is almost always placed on
the shoulder along the right lane. (Tr.
45). Ruof testified that the first sign
“would have been several thousand feet back.”
(Tr. 43-44).
Once signage is posted, the next step
in establishing the traffic control pattern is placing the cones. (Tr. 46-47).
Ruof testified that the placement of the cones is predetermined, with
two skips between each cone. (Tr. 47, 90).
With about twenty feet between each
skip, each cone was estimated to have been about forty feet apart. (Tr. 137-38).
Ruof estimated there was a distance of ten to twelve feet between the
cones that were closer to the taper, as expected due to a tighter proximity. (Tr. 130, 137).
On the day of the incident, workers
on the pattern truck with a TMA placed the cones on the road, starting with the
taper, moving outward, and then down the center of the road. Mr. Villasenor drove the pattern truck while a
laborer got cones ready for placement onto the roadway and another laborer
actually set the cones onto the roadway. (Tr. 47, 50, 126). Cones were placed after
every two skips. (Tr. 90). Ruof, based on his own visual observations,
estimated that the installed taper totaled to 660 feet in length.[51] (Tr. 131-32).
The cones were in place and a traffic control pattern established by
about 10:30 p.m. The next step called
for painters in a paint truck to paint a yellow line along the left side of the
cones. (Tr. 65, 88). Because the paint truck was built to paint
white from the right side of the vehicle and yellow from the left, it was
required to drive west in the right lane in order to paint a yellow line on the
left lane. (Tr. 65). However, the cones were “too close in
proximity” to the area that needed to be painted and, as such, the cones needed
to be moved one and a half to two feet to prevent the paint truck from hitting
or striking the cones. (Tr. 65-66, 107,
128).
The paint truck was sitting in the
left lane at the end of the taper, inside the traffic pattern. (Tr. 76, 88, 122; Ex.9). The decedent had been speaking with the
painters for about 15 – 20 minutes and gave them the go-ahead to “loop around”
and prepare to paint the final striping. (Tr. 66, 88, 123). During this time, traffic had been moving in
the right-hand lane. (Tr. 124).
Ruof saw the decedent starting to
move the cones, one at a time. (Tr. 66, 129; Ex. 9 at 1 at “B”). Ruof stated that he was not surprised when he
saw the decedent moving the cones because the decedent told Ruof that the cones
needed to be moved one and a half to two feet south further into the left “dead
lane” because “the lines had to be painted from the fast lane and [the
painters] were heading around.”[52] (Tr. 82, 87, 123, 128). The decedent then used his cell phone to call
Ruof and told him to “go ahead and let the traffic through.” (Tr.
81-82). Ruof testified he then
communicated the decedent’s instructions by cell phone to an unidentified TMA
driver who he believed was together with the police officer.[53] (Tr. 81-82). Ruof said he was unaware that the cones still
needed to be moved at the time that the decedent gave Ruof the direction to let
the traffic through. (Tr. 82).
During this time and shortly before
the incident, Superintendent Gardner approached Ruof.[54] Gardner was there to “get everything set up
for that final barrier.” (Tr. 66, 78-79).
While Ruof and Gardner were conversing
behind Gardner’s pickup truck, Ruof heard a noise and thereafter noticed that the
decedent had been struck by a moving vehicle at the west-end of the taper. (Tr. 66, 76-77; Exs. 1 at “D”, 9 at “A”). Ruof estimates that the decedent had moved
three or four cones before being struck.[55] (Tr. 126). Mark S. Garber, an operator/laborer employed
by Respondent, was one of the two laborers who had been helping the decedent move
the cones. Garber was struck by a cone
that may have been initially in the decedent’s hand.[56] (Tr. 127, 317; Ex. 18 at 21-22).
According to Ruof, at the time of the
incident, the police vehicle was located several hundred feet east of the
traffic control zone, back near the interchange. (Tr. 67-70, 274-75; Ex. 1 at “B”). Upon being shown the diagram that he drew at
the request of CO Santiago, Ruof also identified a “pattern truck” and a “police
car” as both being located on the right-hand shoulder of the road and stated
that they had already looped around and were preparing to perform the final “slow
roll” to permanently paint the yellow line.[57] (Tr. 73-74, 77; Exs. 1 at “B”, 9). The paint truck had not yet moved from the end
of the taper where the decedent had been speaking with the painters. (Tr. 123-24; Ex. 9). Ruof’s diagram shows the decedent’s truck parked
to the left of the paint truck, the job truck to the left of the decedent’s truck,
and an alleged pattern truck with an attached TMA parked to the left of the job
truck. Ruof testified that neither the
police car nor the “pattern truck” allegedly positioned northeast of the “Arrow
Board” shown on his drawing at exhibit 9 at 1 were placed directly east of the
decedent when he was moving cones.[58] (Tr.
76-77, 143-44; Ex. 9 at 1).
Ruof testified that the decedent was
close by when he was struck by a vehicle.
(Tr. 78). After the incident,
Ruof saw Gardner attempting to resuscitate the decedent. (Tr. 89). Traffic was still flowing, so Ruof pulled his
truck into the right lane to block all traffic. (Tr.
89). Once traffic had been
blocked, Ruof went over to assist Gardner. (Tr. 89).
Shortly after, Ruof again moved his truck, as well as some cones, to
free a path in the traffic pattern for first responders arriving on the scene. Ruof said he was “throwing cones everywhere to
try to get the right people to him [the decedent].” (Tr. 89-90, 97-98, 101-02, 118-19; Ex. 13 at
counter 56 seconds). About twenty
minutes later, Ruof began moving cones back to the center skip. (Tr. 119).
Ruof testified that Respondent’s
regular procedure was to move cones so that lines could be painted or protected
after a pattern had been set up. (Tr.
107). He said that it was Respondent’s
normal procedure to stop traffic when its employees adjusted cones. (Tr. 83).
He testified that when cones were being adjusted a truck with a TMA
device would normally be used to protect the workers. (Tr. 107-08).
Ruof testified that he believed that the decedent should not have been
moving the cones without a vehicle with a TMA or some other kind of protection positioned
behind him for protection. (Tr. 144-45).
Ruof testified that Respondent’s
contract required it to follow PA Pub. 213 when placing signage on the roadway as
part of its safety plan. (Tr. 115; Ex. 4
at 139-43). He further said that there
is nothing within the permanent or overall TCPs or PA Pub. 213 that addresses
the placement of cones while painting lines and setting up for the long-term TCP. He said PA Pub. 213 deals with workers going
to set up a work zone where actual highway construction is performed. (Tr. 117-18; Ex 14). Ruof testified that PA Pub. 213 called for
cones along the travel lanes, and not along a taper, to be spaced no more than
40 feet apart where the speed limit is 40 miles per hour.[59] (Tr. 136-37; Ex. 10, at 00302, 000488). He
said that the cones on the skips at the worksite were “[p]robably 20 feet apart
or something like that.” (Tr. 138). Ruof stated the provisions of PA Pub. 213
did not apply to the set-up work Respondent performed at the worksite on
December 3, 2014 that was setting up for long-term traffic control. (Tr. 142-43).
Superintendent Robert Schaeffer
Robert Schaeffer is another
superintendent for Respondent. (Tr.
149-50). He has worked road and high
construction for more than 30 years and has worked for Respondent for eight
years. (Tr. 149). As a superintendent, his job duties included,
“to manage the crews and people that I have, work subcontractors, oversee the
logistics, and the safety and progress of everybody and everything on the job.” (Tr. 150).
His crews perform the following type of work: “concrete piers and columns underneath the
bridge…placing the stone or excavations in the river…concrete pacing up on the
roadside…maintain the traffic and whatever needs to be done.” His
crews also set up traffic patterns. (Tr.
150).
Regarding the Pottstown worksite, Superintendent
Schaeffer had been assigned the job “probably a week or two prior to this
event,” and, on the day of the incident, he was “getting familiar with the job,
studying drawings that morning.” (Tr.
150-51). He said the project for
December 3 was to paint the line between station numbers 215 and 220. (Tr. 189).
He testified that the decedent was “coming off of vacation to come help
paint the lines” that were used to indicate where the barriers were to be
placed the following day. (Tr. 151-52). Schaeffer was going to “supervise the
subcontractors coming to deliver all the barriers” the next day. (Tr. 151).
Regarding
the length of the transition taper, Schaeffer testified that he spoke with
PennDOT’s representative and resident engineer Rick Allison earlier in the
project regarding visibility at the beginning of the taper.[60] (Tr. 155, 158, 210-11). Due to an overpass of Route 422 over Route
100, the “over vertical” caused concerns regarding visibility: “the traffic on the far side of the [overpass]
does not see what’s happening on the opposite side of the [overpass], until
they’ve come over the top of the [overpass].”[61] (Tr. 158).
Schaeffer
testified that this overpass had an effect on the taper. (Tr. 160-61).
Schaeffer testified that a surveyor, prior to Schaeffer’s work that day,
had painted stations numbers “every 100 feet or 150 feet and 50 foot marks on
the side of the road” for the entire mile length of the project. (Tr. 161-62; Ex. 14 e.g. at “H” for station numbers 215 and 220). There was a curve on the
road which, over the course of “a big distance” is:
a very important thing
to the traffic – PennDOT Traffic Division … because they don’t want people
going 40-50 miles around the curve and you’re going to put barrier up there,
which is a tall barrier, and they can’t see. And it’s visibility and the merge
at the same time. They have – they very
same time they have the merge coming in there, right? So they want people to have – they’ve got
some formula they use so that people have time enough to merge in and the
visibility to see around the corner.
(Tr. 163-64; Ex. 2). Schaeffer testified that his discussion with
Allison occurred because: “No matter
what I do, PennDOT will not allow me to make that transition – that paint line
transition any less than that, because it opens them up to liability. Okay?”
(Tr. 162). Schaeffer testified
that the taper had to be, and was, 660 feet in length.[62] He said he started the cone taper at station
number 220.[63] (Tr. 157-58, 161-64, 168, 208; Ex. 14 at “G” and “H”).
During
December 3, 2014, Superintendent Schaeffer marked reference locations for the
arrow board, and the cone placement for the beginning and end of the taper, and
the pattern. (Tr. 165, 167, 172). Schaffer explained:
Throughout the day I laid out some
of the marks. So what I would do doing -- what I did during the day was I’d go
out on the shoulder of the road -- I’d drive down the shoulder of the road, see
the station number and I’d paint a mark on the barrier or the guardrail off the
road. This is where they’re going to start their pattern. I couldn’t actually
go lay out the actual marks on the roadway until they put the cones up. But
that gave them a reference of where to start their cones, and their arrow board
and so on and so forth.
(Tr.
166; Ex. 14 – taper line).[64] Schaeffer explained that, to paint the
reference lines, he drove a truck on the shoulder[65]
of the median side of the road, pulled up to the location on the guardrail,
opened the door, leaned out the door and painted the marks on the
guardrail. (Tr. 169-75, 188).[66] During this time, someone in a “regular”
pickup truck, without a TMA, would follow behind him because “the travelling
public has a fear of hitting peep—trucks, but they don’t have no fear of
hitting people.” (Tr. 173). Schaeffer testified that he finished painting
the reference lines for the “end of the traffic pattern” by around 10:30 p.m.,
December 3, 2014.[67] (Tr. 165, 171-72). After the cones had been set, Schaeffer saw
that the cones at the worksite were tight about 45 minutes before the incident. He testified: “Those cones, can I say that they’re exactly
40 feet? Some of them were probably
tighter than 40 feet. Some of them may
be a foot or two off. But they were very
tight. Those cones were very tight at
that time.”[68] (Tr 201).
When viewing the NCTPD Dash-Cam
video from Officer Parfeniouk’s patrol car at trial, Schaeffer testified that
he saw five shoulder cones that were about six feet apart where the TCP called
for six cones. He said the police video
taken after the incident did not depict how the cone taper was when he left the
worksite at about 10:30 p.m. before the incident. (Tr. 216-17, 222-23; Ex. 13). Schaeffer
did not know whether the cones were placed every third skip. (Tr. 223).
Although Schaeffer testified that he was not there
when the cones were placed, he stated that “they put the cones out prior to me
going around.” (Tr. 172-74). Schaffer then testified that he saw all of the
cones for the TCP “in place in perfect order before [he] left.” (Tr. 176).
He also testified that the decedent’s crew placed the cones, so he did
not instruct anybody to make sure the cones were a certain distance apart. (Tr. 207).
He then testified “but if they were doing something crazy I would not hesitate
to say something to them at all,” and did not see anything that required him to
call the decedent’s attention to cones that were placed too far apart. (Tr. 207).
He testified that he called the decedent on the phone
to ask him if he needed anything, and to tell him that he (Schaeffer) was
leaving the worksite for the evening.[69] (Tr. 202).
Schaeffer also testified that he told the decedent that he was going to
call Dave Gardner to come back in.[70] (Tr. 202).
Schaeffer testified that he was not aware when he left that decedent
would need to adjust the cones so that the concrete Jersey barrier line could
be painted on the road. (Tr. 176). He testified that he saw Detective Barton’s
vehicle parked in the dead lane when he left.[71]
Schaffer
left the worksite about 45 minutes to an hour before the incident. (Tr. 201).
Upon reviewing the Parfeniouk video in Exhibit 13, Schaeffer testified
that the taper cones were not representative of what he saw when he left the
worksite that night. (Tr. 217-18, 222). Regarding the spacing of the cones on the
straightaway, Schaeffer suggested that Foreman Ruof was mistaken. “I think what Randy was saying – and I’m not
going to put words in [his] mouth, but what he said was skip, space, a skip and
then a cone. So if the skips are 10 feet
long and then you have the space in between, so it’d be – I don’t – can’t say
it’s every third skip.” (Tr. 223). Schaeffer
testified that he had no reason to believe that the workers didn’t use his
paint marks as a guide to place the cones on the taper. (Tr. 212). He also said that a 40 mile per hour speed
limit was posted at the worksite as part of the TCP. (Tr. 190; Ex. 14).
Schaeffer
testified that the traffic pattern had to comply with the TCP laid out by PennDOT.
(Tr. 225). He agreed that PA Pub.
213 guidelines were incorporated into the TCP as a guideline. (Tr. 193-94; Ex. 2, ¶ B. 3. at 000124). Schaeffer testified that the painting work
performed on December 3, 2014 at the worksite was not within the meaning of the
work zone within PA Pub. 213’s TCP.[72] (Tr. 204).
He also said that the “General Notes” of the TCP required Respondent to
follow the contract and the MUTCD. He
further said that page 34 of 60 of the TCP did not have any provision that
addressed the traffic control that Respondent used on December 3, 2014 at the
worksite as a set up for the permanent traffic control to be used afterwards
that page 34 actually reflects. Schaeffer
also said that nothing on the drawing at page 34 of 60 at Exhibit 14 identifies
where cones need to be placed. (Tr. 195;
Ex. 14). He said that drawing shows
where “panelizers”[73]
were to be placed for the permanent configuration at forty feet typical from
the end of merger taper 663[74]
through station number 220 within a day or two after December 3, 2014. (Tr. 196-97, 205; Ex. 14).
Regarding
the contract, Schaeffer testified that the provisions in it relate mainly to
the “travelling public”:
A … I’ve got a written contract
that covers its butt in so many ways it’s pathetic. At the same time I got to
follow what they have on number 14 and make it all work, whether the engineers
got it going on, because there’s sometimes discrepancies. And then sometimes
when you go to lay these signs out the spacing is not quite right. So this is where I end up having the
conversation with Rick Allison and he’s aware of the stuff in this drawing more
than I am. I have to take and blend all these things together to make it work,
and function and try and make it so it makes it work safe for me, and the guys
I’m working with and make it safe for the pedestrians and the travelling
public. So that note is there as a guideline, but at the same time I’ve got to
please the man from PennDOT and make a blend of all these things.
Q And in fact that notes references
the specific contract and a MUTCD and other items that are required to be
followed.
A Yeah.
Q And it’s your understanding that
there’s a recognition then that all of that has to be blended together to work?
A In a traffic unit from PennDOT
takes that all into account, when they start setting this up. Yeah.
Q Does exhibit 14, the single page
for this particular stage, have any provision on it that addresses the traffic
control that’s being utilized to set up the permanent traffic control that’s
reflected on that page?
A Not the set up of it, no. There
are guidelines in the special provisions that PennDOT provides us. And I would
say that they’re the only guidelines besides the Pub 213 guidelines and all
these other. But the important one is what PennDOT is more -- worried about
more than anything else, is the travelling public and not interfering with the
traveling public. So they set time parameters. They set the amount of time,
like when we do the slow roll, we’re allowed to actually stop traffic for 15
minutes, but they say you can only do the slow rolls at certain times on that
side of the road.
(Tr. 194-95).
Schaeffer
testified that the drawing in Exhibit 14 was complied with because he:
laid it out…to comply almost
exactly to that what they have here. Was
I a foot or two one way or the other? Yes.
I was within a foot or two. And
like I said, I’m not going to get away without doing it to the T to this drawing,
because PennDOT would have called me on it or held me accountable.
(Tr. 210;
Ex. 14).
Detective Thomas Barton
Detective Thomas Barton is a police
officer with the NCTPD located in Pottstown, Pennsylvania since May 2011. (Tr. 284). Barton previously worked for the Pennsylvania
State Police from May 1989 until his retirement in 2010. (Tr. 285). In addition to his role as a part-time police
officer, Barton currently holds the rank of Detective involved in criminal
investigations. On the day of the incident,
he was assigned to the construction zone detail on Route 422. (Tr. 285).
Barton estimates that he has
performed traffic control services on Route 422 for J. D. Eckman on at least
twenty different occasions since December 2013. (Tr. 286-88). Prior to the incident on December 3, 2014,
Barton’s primary point of contact for J. D. Eckman was the decedent. (Tr. 289). Barton described his relationship with the
decedent as an amicable work relationship. (Tr. 289).
At the start of every shift, Barton would check in with the decedent to
account for the work-related hours that NCTPD would later bill to J. D. Eckman,
and the two men would frequently engage in small talk. (Tr. 289).
On December 3, 2014, construction workers were performing line painting
to prepare for the installation of a Jersey barrier, which would block off the
left lane so that the flow of traffic would be restricted to the right lane
while the bridge repair project was on going. (Tr. 287). Barton met with the decedent early in the
morning, but because the roadways were still wet from the previous days’ rain,
it was decided that operations would be postponed until later that day. (Tr. 289).
Upon returning to the worksite at
7:00 p.m., Barton parked his marked patrol vehicle on the berm (the right side
of the roadway on the outside of the travel lane) at the interchange of Routes
100 and 422 west. (Tr. 290, 293; Ex. 1
at “B”). Barton was wearing his full
NCTPD uniform, consisting of a tan shirt and black pants, and a black patrol
jacket with a yellow highway vest on top. (Tr. 290-91). At that time, traffic was flowing freely in
both lanes of Route 422 west. (Tr. 291).
Barton met with the decedent and the two
discussed plans for setting up the pattern in the left lane as they waited for
the pattern truck and arrow board to arrive at Barton’s location. (Tr. 291).
Barton described the pattern truck as
a “stake body” Ford truck with a crash attenuator mounted to the rear. (Tr. 291).
The pattern truck was already carrying cones by the time that Barton had
arrived at the worksite. (Tr. 291). Barton testified that the Ford pattern truck’s
TMA was parallel to the ground. He said
the Ford-650 pattern truck was the only TMA that he recalls seeing at the
worksite on December 3, 2014.[75] Barton said the photograph at Exhibit 9, at
page 5, shows the Ford-650 that he saw at the worksite on the evening of
December 3, 2014. (Tr. 349-50). He did not see any Peterbilt truck with a TMA
at the worksite. (Tr. 291, 298, 300, 350).
Barton stated that he saw an arrow board
being pulled by a standard style red J. D. Eckman pickup truck. (Tr. 291).
In establishing a work zone on
December 3, 2014 earlier in the evening, Barton stated that his particular job
was to do a “slow roll,” or a rolling roadblock, to the east of where the
deployment zone would be at Routes 100 and 422 westbound. (Tr. 292-95). Barton stated that once the pattern truck and
arrow board had passed his parked location, he knew, based on his discussions
with the decedent, that such an occurrence was his cue to begin the “slow roll,”
just as he had done when performing slow rolls for projects in the past. (Tr. 293-94). Barton and the decedent had exchanged cell
phone numbers on the day of the incident so that the decedent could call Barton
when it was time to begin the “slow roll.” (Tr. 304). However, Barton did not receive a phone call
from the decedent, stating that they only engaged in face-to-face verbal
communication that day. (Tr. 304).
Once the pattern truck and arrow
board had passed, Barton commenced his “initial slow” roll starting from the
intersection of Route 100 at the overpass, approximately one tenth of a mile
away from where the traffic control pattern was to be set.[76] (Tr. 292, 295). To do so, Barton activated his emergency
signals on his marked police vehicle and drove into the left lane of Route 422
to slow or stop traffic while the pattern truck and arrow board advanced toward
their point of deployment in the pattern.
(Tr. 292). Barton’s emergency
signals were equipped with an arrow stick pattern that was pointed towards the
right lane. (Tr. 294).
In performing the “slow roll” for the
initial cone setup, Barton parked his vehicle at a forty-five-degree angle in
the left lane, exited the vehicle, and manually directed traffic into the right
lane using hand signals and a flashlight. (Tr. 294). Barton estimates that he was outside of his
vehicle and waving cars with his flashlight for approximately 30 seconds. He recalls seeing road signs alerting drivers
that there was going to be a lane shift. (Tr. 296). Respondent’s crew worked to quickly establish
the cone pattern and set the arrow board.
(Tr. 292). Cones were put out to
mark the road closure and the lane change from the left lane to the right
lane. (Tr. 292). He testified that he saw taper cones in
place, including before and after the arrow board. (Tr. 343-44).
Following the initial “slow roll,”
Barton pulled into the dead lane of the pattern and remained for the next set
of directions for providing control over the traffic that was still flowing in
the right lane. (Tr. 294). At approximately 10:00 p.m., Barton moved his
patrol car from inside the traffic control zone to the South Keim Street onramp
(east of the traffic control zone) facing westbound with his lights activated waiting
to perform another “slow roll.”[77] (Tr. 298, 307, 358). Parked next to Barton was Officer Roeder in
his marked white Ford Explorer West Pottsgrove police car. (Tr. 307-08, 315). They waited for word to depart this waiting
spot on the South Keim onramp and for the Ford pattern truck with its TMA to
come and meet them there and perform the second “evolution” with Respondent’s
paint truck. (Tr. 307-08, 351-53). During this time, between 10:00 p.m. and 11:00
p.m., Barton agreed that he “had no knowledge of the movement or direction
observation of the movement of any of those cones” on the worksite. (Tr. 358).
The Ford pattern truck never came to meet them, and the second evolution
never occurred. (Tr. 308, 351).
At approximately 11:00 p.m., while
waiting for Respondent’s Ford pattern truck to arrive at his location, Barton
received a radio dispatch from Montgomery County Police Radio that there were
reports coming in of a worker struck on the highway west of Route 100. (Tr. 308). Barton estimates that it took him less than
two minutes to report to the scene of the incident. (Tr. 308). As he approached the scene, Barton observed
that the arrow board was illuminated, there were cones of the taper directing
vehicles into the right lane, and common citizens’ vehicles were at a
standstill in the right lane at the approach of the pattern. (Tr. 308). Barton did not observe the pattern truck on
his way to the scene. (Tr. 309). Barton recalls passing two red J. D. Eckman
pickup trucks in the dead lane of Route 422 westbound and a blue Jeep Liberty
with damage to the front of the vehicle sitting in the right lane. (Tr. 309-10). He said NCTPD Police Officer Igor Parfeniouk
was seconds behind him.[78] Just beyond the Jeep Liberty, Barton saw the
body of a construction worker in the roadway. (Tr. 310, 316). Upon reaching the other officers who were in
the process of beginning cardiopulmonary resuscitation (CPR), Barton identified
the decedent. (Tr. 310).
Barton said that the taper up to the
arrow board appeared to be as he recalled it after the pattern was initially
set. After passing the arrow board, he
noticed a large gap of missing cones between the arrow board and the crash site
that he later determined after interviews to have come about because one of
Respondent’s workers was throwing them to make room for approaching first
responders. He said that when he had
left the traffic control pattern at 22:00 p.m., “it appeared to be uniform and
in place. Cones were evenly spaced as I
left ….” “[T]he cones that I passed were
uniform and along the skip.”[79] (Tr. 310-14, 351-53, 358).
Barton said that the video from
Parfeniouk’s dash-camera at Exhibit 13, from 40 to 43 seconds, shows the cones
beginning the taper leading up to the arrow board and then out to the skip that
had been set up by Respondent’s crew at 9:00 p.m. When viewing the Parfeniouk video at trial, he
estimated that the length of the taper from an unidentified point before the
arrow board out to the skip to be “100 feet, 150 [feet].” (Tr. 312-13; Ex. 13).
Barton interviewed Garber, age 39, between
1:02 a.m. and 1:30 a.m., December 4, 2014.
Garber began working at J. D. Eckman in August 2014. He started working at the worksite on
December 2, 2014. Garber told Barton he
was east of the paint truck “beyond the location of [the decedent] moving cones
back out to the skip line” to “allow for the painting of the skip chain line.”[80] He told Barton when he saw a vehicle
approaching the decedent, he yelled to
him to “watch out” but was not sure the decedent heard him. He then said he saw the decedent struck on
his right side by the blue Jeep. The decedent
was setting the cone with his right hand when he got hit by the vehicle. He told Barton that he thought that the cone the
decedent was actually setting on the skip line at the time of the incident struck
him [Garber] in the leg after the cone was hit by the vehicle and released by
the decedent.[81] (Tr.
322, 354; Exs. 18 at 21-22, E at 3 at “C”, E at 5 at “A”, F at 1, 5). Barton’s understanding was that the decedent
was returning the cones to the general area to reset the pattern, and not
putting them on skip marks. (Tr. 363;
Ex. F at 1, 5).
Barton interviewed Gardner, age 44, between
1:40 a.m. and 2:00 a.m., December 4, 2014.
Gardner told Barton that he arrived at the incident site at about 11:55 p.m.
and saw the decedent moving cones back towards the skip line. (Tr. 324; Exs. 18 at 21-22, F at 2, 6). He told Barton that he saw a blue vehicle,
driving within the left lane of the traffic control pattern, move back into the
right lane and hit the decedent.[82] (Tr. 324; Ex. 18 at 21-22).
The record further shows that Barton
also interviewed Jonathan Tracey, age 18, between 2:00 a.m. and 2:30 a.m.,
December 4, 2014. Tracey told Barton
that he left the South Keim Street onramp and moved to the traffic pattern
zone. He then moved to the beginning of
the traffic pattern near the arrowboard to set the chain to be pulled “and
moved interfering cones. I moved 2, 1
cone out toward right 1 cone in toward left.
A J. D. Eckman worker in a pickup truck ahead of me move[d] 2 cones, in
left toward his truck and ran up the road.”
He then saw Moser continuing to place “the cones back on center skips. Then got on the truck and pulled into
deadlane/workarea.” Tracy’s written
statement states that when he was in the rear of the paint truck located in the
dead lane/work area, he “noticed [the decedent] from Eckman placing cones to
the left of the chain pull for us to paint during next traffic slowdown. I turned around to sit down and heard the
accident and seen [the decedent] laying on ground.” (Ex. F at 4).
The record also shows that Barton interviewed
Bridget Moser, age 29, between 2:45 a.m. and 3:15 a.m., December 4, 2014. Moser told Barton that the decedent
instructed her to back the paint truck to the beginning of the pattern to do
another “slowdown.” Her written
statement states: “As I was backing up I
look in my left meror (sic) and saw the [decedent] moving a cone closer to the
skip as he did that a car hit him.” (Ex.
F at 3).
Based upon the interviews he
conducted after the incident, Barton’s understanding was that the pattern truck
with the TMA was to complete its “loop around” the Stowe exit and follow behind
the paint truck as it traveled through the right, live traffic lane to complete
its painting operation, while he [Barton] performed his second evolution, “slow
roll.” (Tr. 353). Barton testified that he determined from the
interviews that, at the time of the incident, the decedent was taking cones
from the southern left-hand lane center median “and placing them back in a
northerly direction back to the skip line.”
No one told him that the decedent was moving cones in a southerly
direction when he was struck by the vehicle. (Tr. 361-62).
Barton testified that Newstell
Marable drove the vehicle that struck the decedent. He said that Mr. Marable was cited under
Pennsylvania Title 75 - Vehicle Code, Section 3326, for duties within a
construction zone and also Title 75, Section 17-46F, for not having
insurance. (Tr. 360-61; Ex. 5 at 0211).
Safety Director Robert Wittlinger
Wittlinger is Respondent’s Safety
Director. (Tr. 412). Wittlinger received a phone call from the
worksite while CPR was being performed on the decedent. (Tr. 412).
He arrived at the worksite sometime between 11:00 p.m. and midnight on
the night of the incident and took photographs of the scene as part of
Respondent’s investigation. (Tr. 412-17,
420; Ex. E). He said that the photograph
at Exhibit E at 4 shows the approximate area where the decedent was struck,
including a tent covering the decedent and the final resting point of the Jeep.
He also testified that the photograph
shows that cones were placed on a curving line every other skip; 80 feet apart.
(Tr. 413-16; Ex. E at 4 at “C” and “E”,
respectively).
He testified that Respondent does not
“have a policy requiring a truck-mounted attenuator while traffic protection is
used to set up long term traffic protection.”
(Tr. 416).
With regard to the length of the
taper, he testified that he believed “it was short compared to the traffic
control plan” and he did not know why.
He stated that “if you use the Publication 213 document for a long term
pattern,” the taper for a long-term pattern should have been 320 feet.[83] (Tr. 420-21; Ex. 10 at 000488). Wittlinger did not know which cone allegedly
struck one of the other employees, and he did not see which cone the decedent
was allegedly moving when he was struck.
(Tr. 422).
With regard to the spacing of the
cones on the straightaway, Wittlinger had no opinion as to what the exact
spacing should have been on the taper, although he said the cones are
“typically closer together” in a taper than they are in a straightaway.[84] (Tr. 424-26).
He testified that the spacing of the cones on the straightaway on this
worksite should be 80 feet based on PATA 503 [Work Space in the Left or Right
Lane] in PA Pub. 213.[85] (Tr. 424-29; Ex. 10 at 000488-89). He then testified that the decedent, as the
lead superintendent on this worksite, would have determined the spacing of the
cones of the taper; however, Wittlinger did not know whether the decedent
actually calculated that specific distance on the date of the incident. (Tr. 426-27).
Wittlinger testified that the decedent would have had a copy of the PATA
503 with him. (Tr. 427).
When looking at Section C, PATA 503, PA
Pub. 213 (Ex. 10 at 000302),[86]
regarding the spacing of the cones on the straightaway, Wittlinger testified
that, rather than a 40-foot spacing, 80 feet is okay because on the night of
the incident, short term cones were being used and the “long term pattern had
not been built yet.” (Tr. 429-30; Ex. 10). He stated that page 000489 of PA Pub. 213
(Ex. 10) should be “blended” with the TCP drawings that are based on the
PennDOT drawings for the project. (Tr.
430-31; Ex. 2). He also agreed that 120
feet would be inappropriate for cone spacing in this situation, and that 80
feet would be maximum spacing for cone placement that would have been acceptable
in this situation.[87] (Tr. 431).
Respondent’s Contract with the Commonwealth of Pennsylvania
Relevant portions of Respondent’s
209-page contract include: In
consideration of $36,237,872.39 between the Commonwealth of Pennsylvania and
Respondent:
The description and location of the
project is as follows: Reconstruction of existing asphalt overlaid reinforced
concrete pavement (two lanes in each direction) for approximately 1,000 ft.
along SR 0422, Section M2A - Pottstown Bypass Expressway and asphalt pavement
for roadway tie-ins on both approaches; reconstruction of existing 6-span steel
girders/floor beams/stringers (fracture critical) Schuylkill River Bridge
(S-31311) using 6-span pre-stressed concrete PA Bulb-Tee beams; construction of
approximately 292 ft. long pre-fabricated retaining wall (S-33660); restoration
of approximately 0.11 acres of wetlands; relocation of stream; installation of
multi-duct conduit and junction boxes for future fiber optic lines/ITS
equipment; stormwater management facilities/ pipes; concrete median barrier;
concrete glare screen; guiderail removal and installation; signing; pavement
markings; and other miscellaneous construction, all as indicated on the
drawings approved by the SECRETARY OF TRANSPORTATION for STATE ROUTE 0422,
SECTION M2A in MONTGOMERY AND CHESTER COUNTIES, WEST POTTSGROVE AND NORTH
COVENTRY TOWNSHIPS from approximately 3,800 ft. west of the Schuylkill River
Bridge between Stowe and PA 100 Interchanges at segment 0020/0021 offset
0408/0408 to approximately 3,000 ft. east of the Schuylkill River Bridge at
segment 0010/0011 offset 3072/3072.
(Ex. 4 at 5).
The
Secretary also introduced over 60 pages of PennDOT TCPs into evidence. (Tr.
112, 430; Exs. 2, 14). The main plan
at issue at trial was of the worksite that OSHA inspected. (Exs. 2 at 34, 14 (zoom-up of Ex. 2 at 34)). Superintendent Schaeffer agreed that the TCP,
under the heading “Traffic Control Plan: General Notes and Legend,” incorporates
PA Pub. 213. (Tr. 193; Ex. 2 at 000124). This section
of the TCP also states in pertinent part:
General Notes
A.
This work consists
of the maintenance of traffic and the protection of the traveling public
approaching the construction area and within the limits of construction.
B.
Furnish, erect,
place, and maintain traffic control signs and devices and maintain traffic
during hours of construction and at all other times in accordance with the
methods indicated on these drawings and,
1.
The special
provisions of the contract,
2.
PA Code, Title
67, Chapter 212, official Traffic Control Devices
3.
PDT
Publication 213, Temporary Traffic Control Guidelines,
4.
PDT Publication
35, Approved Construction Materials & Bulletin 151
5.
PDT Publication
408, Specifications
6.
PDT Publication
111M, Traffic Control – Pavement Markings and Signing Standards
7.
Manual on
Uniform Traffic Control Devices (MUTCD)
(Ex.
2 at 000124) (emphasis added).
DISCUSSION
As explained below, the Court vacates
the citation items based on Respondent’s arguments and the Secretary’s failure
to meet his burden of proof to show that:
1) the cones along the straightaway were placed at 120-foot intervals,
2) a TMA was being used to protect employees placing cones near moving vehicles,
and 3) the transition taper was only 120-feet in length at the time of the
incident as alleged in the citation items.[88] The Court concludes that Respondent’s
arguments regarding the lack of evidence supporting the nature of a hazard in
this case, and arguments regarding the discretionary nature of the incorporated
MUTCD provisions, are dispositive to the definition of the hazard in the alleged
general duty clause violation in Citation 1, Item 1, and to the applicability
of the cited standards in Citation 1, Items 2 and 3.[89]
I.
Alleged Violations
a.
Serious Citation 1, Item 1 – Alleged Cone Interval Violation
Along the Straightaway
To prove a violation of the general
duty clause, the Secretary must establish that: (1) a condition or activity in the workplace
presented a hazard; (2) the employer or its industry recognized the hazard; (3)
the hazard was causing or likely to cause death or serious physical harm; and
(4) a feasible and effective means existed to eliminate or materially reduce
the hazard. Arcadian Corp., 20 BNA OSHC 2001, 2007 (No. 93-0628, 2004). The Secretary must also establish that the
employer knew, or with the exercise of reasonable diligence, could have known,
of the hazardous condition. Burford’s Tree, Inc., 22 BNA OSHC 1948,
1949 (No. 071899, 2010), aff’d, 413
F. App’x 222 (11th Cir. 2011) (unpublished)).
“A safety hazard at
the worksite is a condition that creates or contributes to an increased risk
that an event causing death or serious bodily harm to employees will occur.” Baroid
Div. of NL Indus., Inc. v. OSHRC, 10 BNA OSHC 1001, 1003 (No. 79-1775, 1981). “A hazard must be defined in a way that apprises the employer
of its obligations, and identifies conditions or practices over which the
employer can reasonably be expected to exercise control.” Arcadian
Corp., 20 BNA OSHC at 2007. (Resp’t.
Br. at 12). The hazard “is not defined
in terms of the absence of appropriate abatement measures.” Wheeling-Pittsburgh
Steel Corp., 10 BNA OSHC 1242, 1245 (No. 76-4807, 1981) (consolidated), aff’d, 688 F.2d 828 (3d Cir. 1982)
(unpublished).
The Secretary alleges that Respondent
violated the general duty clause of the OSH Act because “the employer did not
furnish employment and a place of employment which were free from recognized
hazards that were causing or likely to cause death or serious physical harm to employees
in that the employer failed to protect employees from vehicle strikes by not
establishing a safe temporary work zone.”
(Citation at 6). The Secretary
claims that “on or about 12/3/2014, the employer created a dangerous
work zone by placing traffic control devices at 120-foot intervals instead of
the required 40-foot intervals.
The employees were not protected from vehicle strikes.” (Citation at 6) (emphasis added). The Secretary proposes that “a feasible and
acceptable means of abatement would be to comply with Pennsylvania PDT
Publication 213 for proper placement of traffic control devices.” (Citation at 6).
Traffic Cone Spacing
In
the hazard definition section of his Brief, the Secretary devotes most of his
argument to establishing the precise spacing of the cones in the straightaway
based on the evidence in the record.
(Sec’y Br. at 7-8). The
Secretary, however, does not address specifically, in his Post-Hearing Brief,
how the spacing of the cones, once established, is a hazard or contributes to
an increased risk of a hazardous event. Baroid Div. of NL Indus., Inc, 10 BNA OSHC at 1003. In his Post-Hearing Brief, the Secretary
states that the traffic cone spacing was “far enough apart for a vehicle
to weave in and out of the work zone without hitting a cone.” (Sec’y Br. at 7). However, Counsel’s closing argument at the
trial included the following:
And so we have a violation here
that the Secretary would argue is directly related to [the decedent’s] death,
in that the cones were spaced far apart enough that drivers passing through the
traffic pattern could actually be confused about whether the left lane was open
or whether the left lane was closed.
(Tr.
441).
It is the Secretary’s
burden to “apprise” Respondent of a specific forty-foot cone spacing requirement
if the Secretary chooses to pursue a general duty clause violation citation for
this issue.[90] Arcadian
Corp., 20 BNA OSHC at 2007. Here the
Court finds first that the Secretary has not established the precise cone
spacing on the straightaway at the time of the incident. The Court further finds that the Secretary
has not established that the spacing constitutes a hazard under the general
duty clause, as defined by Commission precedent.
The Court notes that there are challenges
regarding the evidence in the record with respect to whether the Secretary can
establish precisely what the spacing of the traffic cones was along the
straightaway at the worksite before the incident. For instance, despite devoting significant
time at trial to this fact inquiry by reviewing police vehicle dash-cam videos,
the Secretary concedes in his Post-Hearing Brief that the dash-cam videos (Exs.
13, A) in the record are not reliable because the videos captured what the traffic
cone spacing was post-incident, and it is undisputed that many of the cones
were moved post-incident to allow emergency responders through to the decedent.[91] (Sec’y Br. at 7).
Instead, to attempt to establish the
exact spacing of the cones, the Secretary relies solely upon one part of
foreman Ruof’s testimony that each cone in the straightaway was placed “every
third skip” and ignores other contradictory Ruof testimony where he said the cones
were forty feet apart.[92] Superintendent Schaeffer was present during
Ruof’s testimony, and later in the trial seemed to suggest that Ruof was
mistaken in the “every third skip” description of the cones.[93] (Tr. 223).
Schaeffer also testified that he saw nothing wrong with the placement of
the cones when he left the worksite an hour before the incident occurred. (Tr. 176).
Schaeffer testified that 45 to 60 minutes before the incident some of
the cones were “probably tighter than 40 feet apart. Some of them may be a foot or two off. But they were very tight. Those cones were very tight at that
time.” (Tr. 201). Detective Barton testified that when he
departed the traffic control pattern at 10:00 p.m. the cones were uniform and
evenly spaced along the skip. Barton had
no safety concerns about the cones. The Court therefore finds that the
Secretary has not established the precise spacing of the cones on the straightaway
and has not established that they were spaced 120 feet apart as specifically
alleged in the citation.[94]
The Secretary has also failed to show
that the cones along the straightaway were not set at 40-foot intervals at the
time of the incident. The videos at
Exhibits 13 and A, and the photographs at Exhibit 3 taken from the video at
Exhibit 13, were taken after the incident; after cones had been moved about at
the worksite. Detective Barton and Superintendent
Schaeffer testified that the cones on the straightaway were safe and in good
order before the incident. Both Messrs.
Ruof and Schaeffer testified that the cones along the straightaway were placed
at 40-foot intervals before the incident.
The Secretary has not presented sufficient evidence to overcome their
testimony and show that the cones were placed at a distance beyond 40-foot
intervals.
Notwithstanding the above, the Court now
analyzes Respondent’s argument regarding the existence of a hazard for this
citation item with an assumption that the cones were placed more than 40 feet
apart.
Alleged Traffic Cone Spacing Hazard
Even with this assumption, however, Respondent
persuasively argues that the Secretary has failed to establish that placing
cones at “anything other than 40-foot intervals” presented a hazard in the
first place. The Secretary has provided
no evidence except: (1) the PA Pub. 213,
and (2) the incident itself, to establish that any spacing other than 40-foot
intervals presented a hazard on this worksite.[95] The Court finds that both pieces of evidence,
the PA Pub. 213 and the incident itself, present hurdles that the Secretary did
not overcome to establish a general duty clause hazard, as defined by
Commission precedent, in this case.
The Commission has “hesitated” and
“had reservations” about holding that a breach of levels published by a third-party
organization would constitute a hazard in part because such levels do “not have
the force and effect of law; failure to comply with it is not, in and of
itself, illegal.” Indus. Glass, 15 BNA OSHC 1594, 1603 n.10 (No. 88-0348, 1992) (regarding
heat stress levels in publications by the American Conference of Governmental
Industrial Hygienists, National Institute for Occupational Safety and Health (NIOSH)
and American Industrial Hygiene Association).
The issue of the existence of a hazard is separate from the issue of
recognition, for which, conversely, the Commission does look to third party
publications. Id. at 1603 n.11 (stating that precedent allows relying on NIOSH
document for industry recognition of heat stress).
It is undisputed that Respondent had
multiple traffic control devices in place on the worksite up until the incident. As the Secretary concedes, all four elements
of a traffic control worksite were in place: signs were placed two miles ahead of the
worksite to indicate the advance warning area; the taper was the transition
area; the work zone (separated by spaced cones) was the activity area[96];
and the taper back to the left lane was the termination area. (Sec’y Br. at 15-16). Respondent had a blinking arrow at the
transition area, alerting drivers to stay in the right-hand lane for
construction. Additionally, the decedent
was wearing reflective clothing and PPE at the time he was hit.[97] For this citation item, the Secretary does
not address any of these traffic control devices that Respondent had put in
place on its worksite.
Instead, the Secretary claims that
the spacing of the cones in the work area “created” a traffic hazard, pointing
to the fact that they were not 40 feet apart (as “required” in PA Pub. 213),
and that the driver of the Jeep Liberty veered into the work area.
Regarding PA Pub. 213, the Court finds
that it is a publication by a third-party organization. Indus.
Glass, 15 BNA OSHC at 1603 n.10. This publication is not affiliated with
OSHA. While the Secretary claims that a
“40-foot interval” was “required,” the Secretary has proffered no support in
terms of OSHA regulations or Commission precedent for this claim.[98] Indeed, Commission precedent serves to
undermine the Secretary’s attempt at defining the hazard in this manner. The hazard cannot be defined in terms of the
absence of appropriate abatement measures, in this case, a 40-foot cone spacing
interval. Wheeling-Pittsburgh Steel Corp., 10 BNA OSHC at 1245.
Additionally, the Court notes that PA
Pub. 213 is over 300 pages long. (Ex.
10). Upon identification, the following
exchange occurred between Counsel for the Secretary and Foreman Ruof:
Q I’m
handing you a document marked Government exhibit 10. You can move binder if you
need to look at it, but is this what you were just referring to as PA-213
A Yeah.
Yes, ma'am.
[irrelevant
material omitted]
Q Can you
take a look at that and direct me to the portion that would be relevant to the
way the worksite was set up on December 3rd 2014?
A Let’s
see.
Q There are
page number --
A Yes.
Q -- on the
bottom. They’re sort of small.
A Yeah. I
can’t even -- typical -- I mean I use like 18 and 21. I use those a lot. So --
but --
Q What do
you mean 18, 21?
A Well, the
-- there’s -- you know, a lot of these refer to just, you know, certain
projects you’re on. And I -- you know, the ones I do you use the same stuff.
That’s --
Q Same
stuff.
A --
basically your signage and distance and that’s all it’ll give you.
Q Okay.
A But the
scenarios change. But bear with me. Good lord.
JUDGE
PHILLIPS: Are you asking him to look --
THE
WITNESS: Yeah. I mean --
JUDGE
PHILLIPS: -- at each page of this exhibit or do you want to focus his attention
on something you think is relevant?
MS. LUBY:
Yeah. One second.
BY MS.
LUBY:
Q May have
to get back to that, but --
A Thank
you.
Q -- I’ll
move on.
MS. LUBY: I
have no further questions at this time.
JUDGE PHILLIPS: Thank you, ma’am.
(Tr. 116-17).
This exchange suggests that Foreman
Ruof seemed a bit overwhelmed by the volume of this document.[99] The Court therefore relies on the testimony
in the record regarding this document for guidance. This testimony is slim, and, not
dispositive. Aside from Schaeffer’s general
testimony that PA Pub. 213 served only as a guide, the only other witnesses
that testified to specific pages in this document were Foreman Ruof and Safety
Director Wittlinger. (Tr. 134-41, 193-94,
425-30). Ruof testified to the “General
Notes -Section C: Traffic Control Devices – Channelizing Devices.” (Tr. 134-41; Ex. 10 at 000302). Wittlinger testified to “PATA 503” on pages
000488 - 89. (Tr. 425, 427, 430). Ruof testified that the cone spacing on the
straightaway according to the provision at ¶ C-3 should be 40 feet on the basis
that the speed limit at the worksite was 40 MPH. (Tr. 134-41; Ex. 10 at 000302). Using the “Distance and Spacing Quick
Reference Chart,” Wittlinger testified that the cone spacing on the
straightaway according to PATA 503 [Work Space in The Left or Right Lane] should
be 80 feet. CO Santiago, on the other
hand, testified that he did not recall inquiring into PA Pub. 213 when
interviewing Wittlinger during his investigation. (Tr. 261). This evidence is not determinative as to what PA
Pub. 213 “required” the cone spacing interval to be on the straightaway at Respondent’s
worksite on December 3, 2014.
The Court also notes that the
“Application” section of PA Pub. 213 states the following:
The protections prescribed for each situation shall be
consistent with the general provisions found in the most recent editions of
Title 67 PA Code, Chapter 212, Official Traffic Control Devices and the Manual
Uniform traffic Control Devices as issued by the Federal Highway Administration
and should be based on common sense; engineering judgment; the speed and
volume of traffic; the duration of the operation; the exposure to potential
hazards; the physical features of the highway including horizontal alignment,
vertical alignment, and the presence of intersections and driveways; and other
important factors.
(Ex. 10 at 0294) (emphasis added). The Secretary has not addressed the
emphasized portion of this section of PA Pub. 213, but the Court finds that it
is broadly worded and seems discretionary.
This broadly worded Application section is consistent with the testimony
in the record by Respondent regarding “blending” documents to achieve its
contractual work goals. Superintendent
Schaeffer’s testimony regarding the generally accepted practice of “blending”
of “actual stuff from that 213 into what PennDOT’s got going on.” (Tr. 181, 194-95). Wittlinger also testified that in order to
“build” to the PennDOT drawings (in Respondent’s contract), Respondent had to
“blend the two standards,” clarifying that Respondent has to “blend” the PennDOT’s
drawings with the specifications in PA Pub. 213. (Tr. 430-31).
The Secretary does not address this testimony regarding “blending” these
documents in his Post-Hearing Brief.
Under these circumstances, the Court
finds that PA. Pub. 213 is not supportive evidence for the Secretary’s burden
of establishing a hazard in this case.
Regarding
the incident itself, the record in this case shows that the driver of the Jeep
Liberty was charged with failing to comply with “duties within a construction
zone.” (Tr. 360-61). The Court therefore finds that the record
supports a finding that the driver’s conduct at least contributed to the incident
in this case. The Court also finds that
this evidence undermines the Secretary’s attempt to use the incident as proof
that the cone spacing along the straightaway “created” the hazard in this
case. There is no evidence that
establishes how much of the driver’s own conduct caused or contributed to the incident. The Secretary relies upon a statement
reported by Sergeant Malason in the Police Incident Report made by the driver to
Officer C. Matt Deichert to establish “haphazard” spacing of the traffic cones.[100] (Ex. 18 at 15-16; Jt. Pre-Hr’g St. at 5). Testimony concerning this statement attributed
to Mr. Marable, the driver of the Jeep Liberty, was disregarded by the Court
following Respondent’s objection made prior to Ex. 18’s ultimate admission into
evidence. (Tr. 334). Also, the Court finds this statement by the
driver of the Jeep Liberty has questionable reliability as it is self-serving
to the driver, who was eventually charged despite this statement in the Police
Incident Report. The Secretary has not supplied
in any way evidence to support any claim that the spacing of the cones on this
worksite actually caused this driver to veer into the workzone. The Court therefore finds that the incident
itself, where a driver was eventually charged with not complying with duties in
a construction zone, is not evidence that establishes a hazard in this case, in
the event traffic cones were set at more than 40-foot intervals.
Finally, the Court notes that the
Secretary is also not consistent in addressing the hazard in the remainder of
his Post-Hearing Brief. Rather than
referring to the allegedly improper traffic cone spacing that “created” a
hazard, the Secretary later in his brief suggests that the hazard in this case
is, simply, traffic. See Sec’y Br. at 8 (“Eckman does not dispute that it
recognized the hazard that traffic posed to its employees”), 9 (“[The decedent’s] death shows the seriousness of
failing to protect workers from being hit by oncoming vehicles.”).
In his recognition and likelihood of death/serious harm sections, the
Secretary does not address, in any way, the spacing of Respondent’s traffic
cones; instead the Secretary focuses on traffic alone being a hazard: that Respondent recognized traffic being a hazard
and that traffic can cause death/serious harm.
The Secretary has proffered no arguments, at trial or in his Post-Hearing
Brief, supporting how Respondent recognized that traffic cone spacing at more
than 40-foot intervals was a hazard, and how this traffic cone interval
increased the likelihood of death/serious harm in this case.
This citation item is vacated.
b.
Serious Citation 1, Item 2 – Alleged Truck
Mounted Attenuator Violation
To prove a violation of an OSHA
standard, the Secretary must establish that: (1) the cited standard applies, (2) there was
a failure to comply with the cited standard, (3) employees had access to the
violative condition, and (4) the employer knew or could have known of the
condition with the exercise of reasonable diligence. Astra Pharma. Prods., 9 BNA OSHC 2126,
2129 (No. 78-6247, 1981) aff’d in
relevant part, 681 F.2d 691 (D.C. Cir. 1980).
The Secretary claims that Respondent
violated 29 C.F.R. § 1926.202, a “Signs, Signals and Barricades”[101]
standard which incorporates by reference a portion of the Federal Highway
Administration MUTCD.[102] The citation alleges that Respondent failed
to ensure a TMA was used to protect employees placing temporary traffic control
devices near moving vehicles. (Citation
at 7).
The cited
OSHA standard states: “Barricades for
protection of employees shall conform to Part VI of the Manual on Uniform
Traffic Control Devices (1988 Edition, Revision 3, or the Millennium Edition),
incorporated by reference in Sec. 1926.6.”
29 C.F.R. § 1926.202. Section
1926.6(a) states:
The standards of agencies of the U.S.
Government, and organizations which are not agencies of the U.S. Government which are
incorporated by reference in this part, have the same force and effect as other
standards in this part. Only the mandatory provisions (i.e., provisions
containing the word "shall" or other mandatory language) of standards
incorporated by reference are adopted as standards under the Occupational
Safety and Health Act.
29 C.F.R. § 1926.6(a) (emphasis added); see also KS Energy
Servs., Inc., 22 BNA
OSH 1261, 1264 n. 4 (No. 06-1416, 2008) (non-mandatory MUTCD provision not
incorporated into OSHA standard 29 C.F.R. § 1926.200(g)(2)); Ruhlin Co., 21 BNA OSH 1779, 1785 (No. 04-2049, 2006) (finding no fair notice in part by noting that
“optional” language of the MUTCD is consistent with the Secretary’s enforcement
policy in the Field Inspection Reference Manual that stated “Section 5(a)(1)
shall not be used to enforce ‘should’ standards.”). Therefore, to establish applicability, the
Secretary must show that that the cited MUTCD provision is mandatory and not
discretionary.
The
cited MUTCD provision is reproduced below with underline where emphasis is
added. (Ex. 11 at 20-21).
a.
Impact Attenuators
Impact attenuators are systems
that mitigate the effects of errant vehicles that strike hazards, either by
smoothly decelerating the vehicle to a stop when hit head-on, or by redirecting
the errant vehicle. Impact attenuators in temporary traffic control zones
protect the motorists from the exposed ends of barriers, fixed objects, and
other hazards. Two types of impact attenuators used in temporary traffic
control zones are roadside attenuators and truck-mounted attenuators (TMA’s).
Specific information on the use of impact attenuators can be found in the
AASHTO Roadside Design Guide, Chapter 9.
Attenuators must pass
acceptable performance testing and be designed for each application to ensure
performance that will safely stop or redirect errant vehicles. Periodic
inspection of these devices is necessary to assure that attenuators function as
intended throughout their useful life or that they undergo prompt
repair/replacement if hit or damaged.
1.
Roadside Attenuators
…
2.
Truck-Mounted
Attenuators
Trucks or trailers are often used as protective vehicles to
protect workers or work equipment from errant vehicles. These protective
vehicles are normally equipped with flashing arrows, changeable message signs,
and/or flashers, and must be located properly in advance of the workers and/or equipment
they are protecting. However, these protective vehicles may themselves cause
injuries to occupants of the errant vehicles if they are not equipped with
truck-mounted attenuators (TMA’s).
TMA’s capable of absorbing the impact of errant vehicles can be
attached to the rear of these protective vehicles to reduce, the severity of
rear-end crashes. There are a variety of TMA designs available.
The protective truck must be positioned a sufficient distance in
front of the workers or equipment being protected to allow for appropriate
vehicle roll-ahead, but not so far that errant vehicles will travel around the
vehicle and strike the workers/equipment. The attenuator should be in the full down-and-locked
position. For stationary operations, the truck's parking brake should be set
and, when possible, the front wheels turned away from the work site.
MUTCD, ‘Standards and Guides for Traffic Controls
for Street and Highway Construction, Maintenance, Utility, and Incident
Management Operations,’ 1988 edition, Revision 3, September 3, 1993, Section
6F-8(a)(2) (emphasis added); Ex. 11 at 20-21.
The parties argue over
the meaning of the following provision:
The protective truck must be positioned
a sufficient distance in front of the workers or equipment being protected
to allow for appropriate vehicle roll-ahead, but not so far that errant
vehicles will travel around the vehicle and strike the workers/equipment.
MUTCD, ‘Standards and
Guides for Traffic Controls for Street and Highway Construction, Maintenance,
Utility, and Incident Management Operations,’ 1988 edition, Revision 3,
September 3, 1993, Section 6F-8(a)(2) (emphasis added); Ex. 11 at 21. In accordance with section 1926.6(a), for
this MUTCD provision to apply in this case, the language must be mandatory; it
cannot be discretionary. CO Santiago
agreed that MUTCD Section 6F-8(a)(2) does not state that trucks or trailers
must be used as protective vehicles to protect workers or equipment from errant
vehicles. (Tr. 397-98; Ex. 11 at 21). He also agreed that the provision does not
state that TMAs capable of absorbing the impact of errant vehicles must be used
to reduce the severity of rear-end crashes.
(Tr. 398; Ex. 11 at 21).
When looking at this
provision, the Court looks to the specific language of the provision, as well
as how it fits into the language of the whole part of the section. KS
Energy Servs., Inc., 22 BNA OSHC at 1265 n.8 citing Phoenix Roofing, Inc., 17 BNA OSHC 1076, 1077 (No. 90-2148, 1995) (“stating
that when interpreting disputed terms, Commission looks to ‘the provisions of
the whole law, and to its object and policy’”), aff'd,79 F.3d 1146 (5th Cir. 1996) (unpublished); Morrison-Knudsen Co./Yonkers Contracting Co.,
16 BNA OSHC 1105, 1108 (No. 88-572, 1993) (“explaining Commission construes ‘each
part or section... in connection with every other part or section so as to
produce a harmonious whole’”).
The Court does not find
that this provision is mandatory in the sense that the Secretary has attempted
to prove.[103] In arguing that the provision is in fact
mandatory, the Secretary relies on the word “must” appearing earliest in the
phrase at Section 6F-8(a)(2), MUTCD. The
Secretary argues that “the MUTCD did not require [Respondent] to use a
protective truck with a TMA, but once [Respondent] decided to use one, the
MUTCD required [Respondent] to use it correctly.”[104] (Sec’y Br. at 12-13). It is undisputed that Respondent had at least
one pattern truck with a TMA at the worksite on the day of the incident. What the record is unclear of, however, was
whether Respondent “was using” any truck with a TMA as protection against
errant vehicles on its worksite.[105]
The Secretary argues that a second truck
with a TMA was allegedly parked west of the workers in the work zone and should
instead have been parked east of the workers, so that the TMA provided
protection, as a barricade, from an errant vehicle.
OSHA’s citation alleges
that Respondent employed the alleged second truck with an attached TMA
improperly when it positioned the alleged truck on the west side of the pattern
instead of between the workers and oncoming traffic.[106] (Sec’y Br. at 10). The Secretary’s reading of this provision
would not allow for an employer to have a TMA at the worksite unless it was
operating as a TMA the entire time. The
Court does not read the cited MUTCD provision so broadly so as to convey a
sense that all TMAs must be used at all times as TMAs when on a worksite. The Court is guided by the surrounding
language which indicates that the MUTCD is concerned with the TMA itself being
a hazard, either to the “errant vehicle” or to the workers due to a “roll-ahead”
if the TMA were hit by an “errant vehicle.”
When considering the entire provision as a whole, the Court finds that
this section of the MUTCD suggests a concern about the worker’s safety from an
impact of the TMA itself, not whether an employer must use the TMA as the
Secretary claims. Here, the use of the
phrase, “being protected,” introduces a contemporaneous time element to the
interpretation of this phrase. The
phrase “being protected” conveys that, if an employer is actively using a TMA
on its worksite as a protective device for workers against errant vehicles, then
the TMA must be positioned accordingly.
Here, the record does not
show that Respondent was actively using any TMA as protection for workers from
errant vehicles at the worksite on the night of the incident. The record indicates that the one TMA that by
all accounts was at the worksite was en
route away from the worksite performing a “loop around” to get into
position to perform another “slow roll” to assist the painters painting a
yellow line. There was no other vehicle
with a TMA at the worksite.[107]
Thus, there is not enough evidence in
the record to establish that any vehicle with an attached TMA was being used as
a TMA to protect any worker that night working within the pattern at the
worksite.[108] To prove applicability, the Secretary has the
burden to show that the Respondent’s workers in the work zone were “being
protected” by a TMA, but the record does not support such a finding. CO Santiago, during his investigation, made
no attempt to discern why the Ford truck with an attached TMA was not in a position
to the east of the workers in the work zone on the night of the incident. Under these circumstances, the Court finds
that the Secretary has not established that the cited OSHA standard is
applicable to the worksite here.
This citation item is vacated.
c.
Serious Citation 1, Item 3 – Alleged Taper
Length Violation
The Secretary claims that Respondent
violated 29 C.F.R. § 1926.200(g)(2), incorporating MUTCD 1988 Edition
Section 6C-3 because Respondent “did not provide a roadway transition taper of
the requisite length to ensure safe vehicle routing around the temporary work
control zone.” (Citation at 8). The Secretary claims that “on or about
12/3/2014, the employer did not establish a transition taper for the temporary
traffic control zone to ensure safe vehicle routing and that was incompliance
with Table VI-2 of the MUTCD, 1988 Edition, Revision 3. The employer’s installed taper was
approximately 120 feet in length which was much shorter than the approximately
300 feet required by Table VI-2.”
(Citation at 8).
Section 1926.200(g)(2) states: “All traffic control signs or devices used for
protection of construction workers shall conform to Part VI of the MUTCD, 1988
Edition, Revision 3, or Part VI of the MUTCD, Millennium Edition, incorporated
by reference in Sec. 1926.6.” 29 C.F.R.
§ 1926.200(g)(2). As noted above,
section 1926.6(a) provides that only the mandatory provisions of the cited
MUTCD apply. Here, the Secretary states
that the MUTCD “requires” a taper that is “approximately” 300 feet long in this
case. (Citation at 8). However, the Court
finds that the cited MUTCD provisions do not impose a mandatory taper length as
the Secretary claims.
As with the previous
citation item, the Court looks to the provision in question, as well to how
that provision fits into the language of the whole part of the section. KS
Energy Servs., Inc., 22 BNA OSHC at 1265 n.8 citing Phoenix Roofing, Inc., 17 BNA OSHC at 1077 (“stating that when
interpreting disputed terms, Commission looks to ‘the provisions of the whole
law, and to its object and policy’”), aff'd,79
F.3d 1146 (5th Cir. 1996); Morrison-Knudsen
Co./Yonkers Contracting Co., 16 BNA OSHC at 1108 (“explaining Commission
construes ‘each part or section... in connection with every other part or
section so as to produce a harmonious whole’”).
Below is the
relevant portion of the MUTCD for this citation item. (Ex. 12 at 4-5). Throughout this provision, the Court
emphasizes (by an underline) the discretionary language that is used and notes
that there is no mandatory language in the accompanying paragraphs to Table
VI-2. The Court, however, also notes the
use of the words “minimum” and “maximum” in Table VI-2.
A common important element
of a temporary traffic control zone is a roadway taper. Tapers may be used
in both the transition and termination areas. Tapers are created using a series
of channelizing devices or pavement markings placed to move traffic out of or
into its normal path. Whenever tapers are to be used near interchange ramps,
crossroads, curves, or other influencing factors, it may be desirable to
adjust the length of tapers. Longer tapers are not necessarily better than
shorter tapers (particularly in urban areas characterized by short block
lengths, driveways, etc.), because extended tapers tend to encourage sluggish
operation and to encourage drivers to delay lane changes unnecessarily. The
real test of taper length involves observation of driver performance after
traffic control plans are put into effect. Types of taper lengths are
presented in table VI-2. The maximum space between devices in a taper normally
approximates the distance in feet of the speed in miles per hour (i.e.: a 55
mph speed road should normally have devices spaced about 55 feet apart).
Types of tapers are shown in figure VI-2 and the two-way traffic taper is shown
in figure VI-3:
Table VI-2. Taper length criteria for
temporary traffic control zones |
|
Type of taper |
Taper length |
Upstream tapers |
|
Merging taper |
L minimum |
Shifting taper |
½ L minimum |
Shoulder taper |
⅓ L minimum |
Two-way traffic taper |
100 feet maximum |
Downstream tapers |
100 feet minimum |
(use is optional) |
|
Formulas for L** |
|
Speed |
Formula |
40 mph or less |
L = WS2 |
45 mph or greater |
L = W x S |
a.
Merging
Taper
A merging taper requires the longest
distances because drivers are required to merge with an adjacent lane of
traffic at the prevailing speed. The taper should be long enough to
enable merging drivers to adjust their speeds and merge into a single lane
before the end of the transition. For freeways, expressways, and other roadways
having a speed of 45 mph or greater, the minimum length for merging tapers should
be computed by a formula L = W x S. For residential, urban, and other
streets with speeds less than 45 mph, the formula L = (W X S2)/60 should
be used. Under either formula, L is the taper length in feet, W is the
lateral shift of traffic due to the partially or fully closed lane (in feet),
and S is the posted speed, the off-peak 85th percentile speed prior to work
starting or the anticipated operating speed. The formula L = (W X S2)/60
is used for speeds less than 45 mph because slower traffic can merge safely in
a shorter distance.
(MUTCD, Temporary Traffic Control Elements, Section
6C-3 at Ex. 12 at 3-4). (emphasis added).
Using the formula in
Table VI-2, the Secretary claims that the MUTCD “required” the taper in this
case to be at least 320 feet long.
(Sec’y Br. at 16). The Secretary then
relies on CO Santiago, who initially testified that he estimated the taper
length to be 120 feet long based on video and stills from Officer Parfeniouk’s dash-cam video taken after the incident took place.[109] (Sec’y Br. at 17 citing Tr. 375-76; Exs. 3 at
1, 13). Later, when viewing the video
taken in Officer Hollis’ patrol car and using the still photograph taken from
the Parfeniouk video at Ex. 3 at 2 [bottom photograph] in the courtroom, CO
Santiago increased his estimated taper length from 120 feet to 160 feet. (Exs. 3 at 2 [bottom photograph], 13,
A). Citing to this later testimony at
“[Tr. at 396]” presented by CO Santiago in the Secretary’s Post-Hearing Brief in
support of an assertion the Secretary attributes to Wittlinger, the Secretary asserts
that Wittlinger estimated the taper length on this worksite to be 160 feet long.[110] (Sec’y Br. at 17 citing Tr. 396). In this way, the Secretary alleges that
Respondent violated the cited standard.
(Sec’y Br. at 16).
Schaeffer, on the
other hand, testified that the taper was 660 feet in length.
He said he started the cone taper at station number 220.[111] (Tr. 157-58, 161-64, 168, 208; Ex. 14 at “G” and
“H”). As previously stated in fn. 62, Schaeffer
determined the length of the taper by using the station markers 220 and
215. (Tr. 168-69; Ex. 14). He stated that there was no way PennDOT
inspectors would have allowed him to be shy of 600 feet because of the
liability and everything else. (Tr.
200). He testified that he went for a
full 660 feet. (Tr. 168-69, 200). Schaeffer
testified that he had no reason to believe that the workers didn’t use his
paint marks as a guide to place the cones on the taper. (Tr. 212).
Ruof, too, estimated that the
installed taper was 660 feet in length. (Tr. 131-32).
The Secretary did
not call Villasenor, Garber, Moser or Tracy, or any worker who set the cones in
place at the worksite to testify about the length of the taper. CO Santiago took no measurements at the
worksite, including the skip lines or Schaeffer’s paint markings for the
taper. Cones had been moved from the
taper following the incident before the videos and photographs were taken. As previously stated, the Court is also unable to discern
whether or not the two cones at Exhibit 3 at 2, bottom photograph, at “B”, are
the first cones located at the center line; or at the end of the taper. There are at least two gaps of undetermined
lengths shown on that photograph and in the videos at Exhibits 13 and A, both
before and after these two cones. Both
the videos at Exhibits 13 and A and the photograph at Exhibit 3 at 2 [bottom
photograph] taken from the video at Exhibit 13 were taken after the incident,
after cones had been thrown and removed from the taper. Based upon the
contradictory evidence before it, the Court is unable to make a finding as to
the precise length of the taper; including whether the taper was less than the “required”
approximately 300 feet as alleged by the Secretary. (Citation at 8). The Secretary carries the burden to prove the
length of the taper; something he has failed to do. He has failed to show that the taper was only
120-feet in length. He has also failed
to overcome the direct testimony by Messrs. Ruof and Schaeffer that the taper
was about 660 feet in length at the time of the incident.
Notwithstanding the
above, the Court also analyzes Respondent’s argument that the cited MUTCD
provisions do not apply because they are discretionary. (Resp’t Br. at 26-27). Respondent argues that “through use of the word ‘should’ in the
cited MUTCD provision, the definitions in Section IA.13 of the MUTCD identifies
Section 6C-3 as only Guidance, which is defined as a ‘recommended, but not
mandatory, practice in typical situations.’ MUTCD, Section IA.13.” (Resp’t Br. at 24). Section IA.13 of the MUTCD is not included in
the record as an exhibit. KS Energy Serv., Inc., 22 BNA OSHC at 1265 n.8 (noting that it is
consistent with Commission precedent to refer to other provisions of the MUTCD when
interpreting a disputed term of a provision of the MUTCD) (citations omitted). This citation item, however, can be disposed
of by weighing the arguments and placing the burden appropriately on the
Secretary.
The Secretary does
not address, in any way, the discretionary language of these provisions with
respect to the applicability of the cited standard, stating simply that the cited
MUTCD provision “requires” a certain transition taper length. (Sec’y Br. at 14-16). The Secretary looks only to the language
within Table VI-2, which the Court notes does use the word “minimum.” (Ex. 12 at 4). However, as Respondent points out, the
accompanying language to this table is discretionary: “For residential, urban, and other streets with
speeds less than 45 mph, the formula L = (W X S2)/60 should be
used.” (Ex. 12 at 4). Indeed, all of the language in the paragraphs
surrounding Table VI-2 is discretionary, using words such as: “may,” normally,”
and “should.” There are no instances of
the words, “shall” or “must,” which would indicate a mandatory provision that
would be incorporated to the cited OSHA standard pursuant to 29 C.F.R.
1926.6(a). Ruhlin Co., 21 BNA OSHC at 1784 (only mandatory provisions of the
MUTCD are incorporated as standards by § 1926.200(g)(2)).
The Secretary does not
address any of this accompanying language to Table VI-2 in his argument, not
even to explain how to reconcile the use of the word “minimum” buried,
contextually, within the overwhelmingly discretionary language surrounding it. But Respondent does address this
discretionary language in its counter-argument, claiming that the discretionary
language renders this cited MUTCD provision inapplicable. The Court agrees with Respondent, as the
Secretary has set forth nothing to support his argument. As such, the Secretary leaves Respondent’s counter-argument
unrebutted. The Secretary therefore has
not carried his burden in establishing the mandatory nature of the cited MUTCD provision.
The Court finds that the MUTCD does not “require” a certain taper length
in this case. The Court is persuaded by
Respondent’s argument regarding the discretionary nature of the length of the
transition taper in the cited MUTCD provision.
There is no such mandatory language, and so the Court finds that this
particular provision is not incorporated by reference into the cited OSHA
standard. 29
C.F.R. § 1926.6(a).
For the reasons stated above, the cited standard is inapplicable
in this case. This citation item is vacated.
FINDINGS OF FACT AND CONCLUSIONS
OF LAW
All findings of fact and conclusions of law
relevant and necessary to a determination of the contested issues have been
made above. See Fed. R. Civ. P.
52(a). All proposed findings of fact and
conclusions of law inconsistent with this decision are denied.
ORDER
Based on these findings of fact and
conclusions of law, it is ORDERED
that:
1)
Item
1 of Citation 1, alleging a serious violation of section 5(a)(1) of the OSH
Act, 29 U.S.C. § 654(a)(1), is VACATED.
2)
Item
2 of Citation 1, alleging a serious violation of 29 C.F.R. § 1926.202, is VACATED.
3)
Item
3 of Citation 1, alleging a serious violation of 29 C.F.R. § 1926.200(g)(2),
is VACATED.
SO ORDERED.
_/s/Dennis L. Phillips_________
The Honorable Dennis L. Phillips
U.S. OSHRC Judge
Date: October 30, 2018
Washington, D.C.
[1] Thomas Benjamin Huggett, Esq., Little Mendelson, P.C., Philadelphia,
PA, represented Respondent at the trial.
[2] The driver was eventually cited for his actions “under Pennsylvania Title 75 Vehicle code, Section 33-26 for duties within a construction zone, and also Title 75 ...17-46F, for insurance – not having insurance on his vehicle.” (Tr. 360-61).
[3] The Court notes that in the Jt. Pre-Hr’g St., the stipulations are incorrectly numbered: the number 5 is repeated. Thus, there are eleven factual stipulations rather than the ten as numbered in the Jt. Pre-Hr’g St. and as discussed at the trial. (Jt. Pre-Hr’g St. at 6-8; Tr. 20). The Court has corrected the numbering here in this Decision and Order.
[4] For personal privacy reasons, the name of the decedent has been omitted from this Decision and Order.
[5] Section 5(a)(1) of the OSH Act, the “general duty clause,” requires that each employer “furnish to each of his employees employment and a place of employment which are free from recognized hazards that are causing or are likely to cause death or serious physical harm to his employees.” 29 U.S.C. § 654(a)(1).
[6] PA Pub. 213 refers to Pennsylvania Publication 213, Temporary Traffic Control Guidelines (PA Pub. 213).
[7] Section 1926.202, a “Signs, Signals and Barricades” standard which incorporates by reference a portion of the Federal Highway Administration MUTCD states: “Barricades for protection of employees shall conform to Part VI of the Manual on Uniform Traffic Control Devices (1988 Edition, Revision 3, or the Millennium Edition), incorporated by reference in section 1926.6.” 29 C.F.R. § 1926.202. (Tr. 194; Ex. 2 at 000124).
[8] Section 1926.200(g)(2), also incorporating by reference a portion of the MUTCD, states: “All traffic control signs or devices used for protection of construction workers shall conform to Part VI of the MUTCD, 1988 Edition, Revision 3, or Part VI of the MUTCD, Millennium Edition, incorporated by reference in Sec. 1926.6.” 29 C.F.R. § 1926.200(g)(2).
[9] To more clearly identify the cones at issue in Citation 1, Item 1, the Court uses the term “straightaway” to describe the location of the cones as they were placed on or near the dashed lines along the centerline of Route 422 west at the time of the incident. The Court acknowledges that the videos and photographs taken after the incident show that the “straightaway” was slightly curved. (Tr. 381-82; Exs. 3, 13, A, E at 4).
[10] Section 1926.6(a) states in pertinent part:
The standards of agencies of the U.S.
Government, and organizations which are not agencies of the U.S. Government which are
incorporated by reference in this part, have the same force and effect as other
standards in this part. Only the mandatory provisions (i.e., provisions
containing the word "shall" or other mandatory language) of standards
incorporated by reference are adopted as standards under the Occupational
Safety and Health Act.
29 C.F.R. § 1926.6(a) (emphasis added).
[11] Respondent’s headquarters is in Atglen, Pennsylvania. (Tr. 37).
[12] PA Pub. 213 defines “Taper” as:
A series of channelizing devices and/or paint lines installed for the purpose of moving traffic out of or into the normal path. Various taper types have differing minimum lengths, most of which are based upon an ‘L’ distance. The formula to determine distance L is shown on the corresponding PATA notes page. It should be noted that the taper length is a distance per lane; so if a single taper covers two lanes, the total taper length will be double the calculated or minimum distance.
• Merging Taper – Used when drivers in multiple lanes are required to merge into a common road space. Minimum length is L.
• Shifting Taper – Used when a lateral shift is needed. Minimum length required is distance ½ L, unless traffic is approaching a one-lane, two-way condition; in this case the minimum length is 50’. …
(Ex. 10 at 000310).
[13] Superintendent Robert Schaeffer testified that the barriers to be delivered on December 4, 2014 to the worksite were to include both concrete and metal barriers. (Tr. 151).
[14] Respondent had multiple other contracts with PennDOT at the same time as the one at issue. (Tr. 39). Foreman Ruof was pulled from his other project to work on the project at issue, and at times during his testimony, Ruof expressed some unfamiliarity with specifics about the project at issue because, “like I said, this wasn’t my project[.]” (Tr. 109).
[15] Ruof and the decedent had known each other and previously worked together on other projects for the past three to four years. (Tr. 39; Ex. 18 at 17). Ruof said that the decedent was Respondent’s traffic expert. (Tr. 121). Ruof testified that the decedent was “good to his crew, good to his men,” and that Ruof never had to bring any safety issue to the decedent’s attention because the decedent had always “taken care” of it. (Tr. 39).
[16] Villasenor did not testify at the hearing.
[17] The westbound lanes were 12 feet wide each. (Tr. 224).
[18] These advance warning signs up that night included a “work area ahead” sign, a “lane closure ahead” sign, and a merge sign. (Tr. 44).
[19] The Court is using the videos and testimony thereon to describe the worksite here, but the Court recognizes that the video in Exhibit 13 (and related Ex. 13 still photographs in Ex. 3) and Exhibit A show the worksite after the incident took place. The Court is mindful that the testimony regarding these videos is indicative of the worksite after the incident took place. The Court is also mindful that these videos serve as a basis of OSHA’s investigation, subsequent citation and the Secretary’s prima facie case here.
[20] According to Ruof, the arrow board had “flashing lights that indicate direction, or there’s four corners, or just a regular bar or an arrow going one way left or right.” (Tr. 44).
[21] Ruof testified that many of these cones were moved from the middle of the roadway to the left-hand shoulder to make room for emergency vehicles to reach the decedent, and so they are not in full view in the video and pictures introduced at trial. (Tr. 97-98). Ruof testified that these cones were not moved until after the incident had taken place. (Tr. 89).
[22] The Court notes that CO Santiago’s first name is also spelled “Eduardo” in the Jt. Pre-Hr’g St. at 5 and the Sec’y Br. at 5.
[23] Schaeffer testified the eradication task would have been performed from within a truck, which would have been part of a “slow roll” procession. (Tr. 183-85).
[24] Detective Barton testified that he arrived at Respondent’s worksite at 7:00 p.m. (Tr. 290).
[25] The paint truck did not have a TMA attached to it. (Tr. 143).
[26] Ruof testified that Guidemark, Inc. provided painters, including Bridget Moser and Jonathan Tracey, for the project. (Tr. 50; Ex. 4 at 201-02).
[27] Ruof testified that he then communicated the decedent’s instructions to the “TMA driver”, who he believed was together with the police officer [presumably Barton]. According to Ruof, the unidentified driver of the alleged second truck with a TMA conveyed the decedent’s instructions to the police officer. (Tr. 82; Ex. 9 at “D”). Barton testified that he was eight-tenths of a mile east of the traffic control pattern at the South Keim Street onramp parked along-side Officer Roeder prior to, and at, the time of the incident. The Ford truck with its TMA was performing its “looping around” and was not with Barton. There is no evidence to corroborate Ruof’s testimony that a second truck with a TMA, along with its driver, was parked together with Barton and Roeder at that time and location.
[28] At the time of the trial, CO Santiago had worked for OSHA for seven years. Previously, he had 10 years in the safety industry, working as a safety manager for a furniture distribution company, and as a safety coordinator for a company called Church & Dwight, and also the precast concrete company Oldcastle Precast. He has a bachelor’s degree in Occupational Safety and Health. (Tr. 235-36).
[29] The record indicates that Respondent’s Safety Director, Richard Wittlinger, called OSHA at 2:21 am on December 4, 2014 and left a voice message regarding the worksite fatality on the after-hours hotline. (Ex. 7).
[30] CO Santiago worked out of the Philadelphia area OSHA office. (Tr. 396-97). Fellow CO Chris Ann Nine accompanied him on this inspection. CO Nine did not testify at the trial. (Tr. 238).
[31] The video shows channelizing devices on the east-bound lanes, cordoning off the right-hand lane where CO Santiago and several of Respondent’s pattern trucks were parked. (Tr. 240-43; Ex. 8). This video shows the channelizing devices on December 4, not the worksite the night prior on December 3, the actual night of the incident.
[32] PA Pub. 213 states that it applies to contractors performing construction or any other type of work on highways. It states it “has precedence over information found in the MUTCD.” It further states that the traffic control schemes and guidelines:
are minimum desirable applications for normal situations, and additional protection may be needed when special complexities or potential hazards prevail. The protection prescribed for each situation shall be consistent with the general provisions found in the most recent editions of Title 67 PA Code, Chapter 212, Official Traffic Control Devices and the Manual on Uniform Traffic Control Devices as issued by the Federal Highway Administration and should be based on common sense; engineering judgment; the speed and volume of traffic; the duration of the operation; the exposure to potential hazards; the physical features of the highway including horizontal alignment, vertical alignment, and the presence of intersections; and other important features.
(Ex. 10 at 000294).
[33] Initially only pages 21 and the top of page 22 of the Police Incident Report were admitted into evidence at the trial. (Tr. 326, 328, 410; Ex. 6). Later, the entire Police Incident Report was admitted into evidence. (Tr. 340). When asked how the Police Incident Report was helpful to his investigation, CO Santiago testified that the “incident report has information in it about how the traffic control zone was haphazardly set up.” The Court sustained Respondent’s objection to CO Santiago’s testimony in this regard and accordingly disregards his response to the question. (Tr. 250-51). The Court has reviewed the interview statements, and the only interviewee who uses the word “haphazard” was the driver of the Jeep Liberty. (Ex. 18 at 15 of 27). The Secretary relies on this statement, rather heavily, in his brief to support the definition of the hazard for the alleged general duty clause violation. (Sec’y Br. at 7). Later, without objection, CO Santiago said he used the Police Incident Report to ascertain more insight into the accounts of the incident and fill in information that he did not obtain during his interviews. (Tr. 251).
[34] There was confusion at the hearing as to which video CO Santiago used to determine facts about the worksite that he reported back to the Philadelphia Area OSHA Office to support the citation. On direct examination, the Secretary questioned CO Santiago regarding the location of Respondent’s equipment (i.e., trucks, TMA, and traffic cones) at the worksite using Officer Igor Parfeniouk’s dash-cam video at Exhibit 13. (Tr. 254-60, 309, 311). On cross-examination, CO Santiago stated that the video he testified to on direct (Exhibit 13) was not in fact the video he used as a basis for his observations that were the basis for the citation. (Tr. 387-89). Respondent then introduced another dash-cam video as Exhibit A and continued the cross-examination of CO Santiago. (Tr. 390-96). This dash-cam video was taken from “the first officer responding, Officer [George] Hollis, of the North Coventry Police Department, who was the lead vehicle.” (Tr. 389). Officer Hollis was the shift supervisor from North Coventry Township that evening. (Tr. 308-09). At the beginning of the trial, Respondent had objected to the use of pictures in Exhibit 3, stating that they were not the best evidence to be used as the pictures were stills from the video in Exhibit 13. (Tr. 10-13). The objection was overruled on the basis that the video would be played and testified to at the trial. Respondent also objected to the introduction of Exhibit 13, but on the basis that it was unknown whether it had been edited. (Tr. 13). Exhibit 13 was admitted based on the Secretary’s assertion that it was unedited. (Tr. 14). At this point, the Court now treats the pictures in Exhibit 3 with the same level of scrutiny as that of Exhibit 13. Neither party objects to the use of Exhibits 3 or 13 on the basis that CO Santiago did not actually use them as a basis for his initial observations that served as the underlying basis for the citation. Instead, he testified that he used the Hollis dash-cam video at Exhibit A. (Tr. 385-88; Ex. A).
[35] CO Santiago testified that he used the visual evidence shown in the NCTPD dash-cam video and the measurements provided by Sergeant Malason to determine that the length of the taper was allegedly about 120 feet. (Tr. 375; Ex. A).
[36] Schaeffer testified that Gardner returned to the worksite around 10:30 p.m. and replaced Schaeffer at the jobsite when Schaeffer went home for the day. (Tr. 172, 174, 202). The Court finds Gardner actually arrived at the worksite at about 10:55 p.m., December 3, 2014 based upon what he told Detective Barton only three hours later. Ruof testified that he observed Gardner attempting to resuscitate the decedent directly after the incident. (Tr. 89).
[37] CO Santiago testified that he could see eight or nine cones in the diagonal part of the taper shown in the NCTPD dash-cam video at Exhibit 13, counter 43 seconds. (Tr. 259).
[38] Schaeffer testified that the cones were “in perfect order” before he left the worksite around 10:30 p. m. (Tr. 176).
[39] The Court notes that CO Santiago agreed that Respondent allegedly recognized “traffic” as a hazard, not the spacing of the cones. (Tr. 367).
[40] CO Santiago testified that Gardner told him that “the pattern truck was inside that transition area and the [Ford] TMA was looping around.” He said that the transition area was “[i]nside the channelizing devices, the cones set up at an angle.” (Tr. 270). He did not further identify the pattern truck with a TMA allegedly in the transition area at the time of the incident; nor its driver or passenger(s), if any.
[41] Although CO Santiago testified that he received information during interviews that there was a pattern truck inside the pattern or taper, he stated earlier that he was not sure of the location of the TMA. (Tr. 277, 369-71, 406-07).
[42] The Court has found that CO Santiago was mistaken as to receipt of any such statement from Gardner.
[43] Ruof
testified that the photograph at Exhibit 9, at 2, showed a truck with a
TMA. He said that trucks with a TMA do
not usually function as a pattern truck placing cones onto a roadway as well as
a protective vehicle at the same time.
(Tr. 104; Ex. 9, at 2).
[44] CO Santiago used the following mathematical formula to determine this length as provided in the cited MUTCD section: L = (w * speed limit)2/60, where “L” is the taper length, and w is the lane width (both in feet). CO Santiago used 12 feet for the width of the lane, and 40 miles per hour for the speed limit. (Tr. 374; 405-06).
[45] After passing the arrow board following the incident,
Barton noticed a large gap of missing cones between the arrow board and the
crash site that he later determined after interviews to have come about because
one of Respondent’s workers, Ruof, was throwing them to make room for
approaching first responders. (Tr. 89,
310-14, 351-53, 358). At least two gaps of an undetermined lengths
within the taper are shown in the dash-cam videos at Exhibits 13 (Parfeniouk
video) at counter 47 seconds, and A (Hollis video) at counter 2 minutes, 34
seconds).
[46] The Court notes that MUTCD’s Section 6F-5, Channelizing Devices, states that channelizing devices include cones and that such devices “should provide for smooth and gradual traffic movement from one lane to another, onto a bypass or detour, or to reduce the width of the traveled way. They may also be used to separate traffic from the work space, .…” (Ex. 10 at 15).
[47] Ruof testified that these four areas were in place at the worksite. He further testified that, depending on the job, a “little buffer zone” may be included as an additional area at the end of the taper which typically included a truck with a TMA, shadow vehicle, a vehicle with flashing lights, or marked police car. (Tr. 140-41; Ex. 12 at 2-3). Ruof did not look at the TCP in effect at the worksite site before the incident. (Tr. 115).
[48] Ruof testified that the signage was for a short duration of time as part of the work that he described as “temporary maintenance and protection.” (Tr. 42).
[49] The Court finds that this was the Ford truck with a TMA. (Ex. 9 at 1, at “D”; 3, 5). Ruof testified that if something hits the crash attenuator “it crumples to protect all parties involved.” (Tr. 103; Ex. 9 at 2 at “A”).
[50] The Court finds that there is insufficient evidence to support Ruof’s testimony that a second truck with a TMA was at the worksite on December 3, 2014.
[51] Ruof testified that he did not agree with OSHA’s allegation that the taper was about 120 feet in length. (Tr. 131-32).
[52] Ruof’s testimony that the decedent was moving cones
in a southerly direction when struck by the Jeep
contradicts Detective Barton’s testimony that he determined from interviews that, at the time of the incident, the decedent was taking cones from the southern left-hand lane center median “and placing them back in a northerly direction back to the skip line.” It is not necessary for the Court to resolve whether or not the decedent was moving cones in a northern or southern direction at the time of the incident. The Court finds that the decedent was moving a cone when he was struck by a Jeep Liberty.
[53] As previously noted, the Court has found Ruof’s understanding that a TMA driver was together with Detective Barton and Officer Roeder at this time was in error.
[54] Ruof was approaching the end of his eight-hour shift which was due to end at 11:00 p.m. The lines were going to be painted and he was going to “get on out of there.” Once the painting was completed no other workers would be working at the worksite. (Tr. 79, 122).
[55] Ruof testified that cones along a distance of about
150 feet needed to be moved. (Tr.
128). He estimated that
these cones were spaced about eight to ten feet apart. (Tr. 130).
[56] Villasenor and Garber helped the decedent move the cones. Villasenor then departed the pattern area and drove west in the Ford pattern truck with the TMA deployed to the Stowe exit. On his way back eastbound on Route 422 after looping around, he saw someone down in the roadway and police at the scene. (Tr. 127, 344; Ex. 18 at 21-22, 24).
[57] The
Court finds Ruof’s testimony to be in error.
The Ford pattern truck with a TMA was being driven by Villasenor west of
the traffic control zone and the site of the incident in a loop around Route
422 at the time of the incident. The
Court further finds that Ruof’s drawing at Exhibit 9, at 1, does not accurately
depict the position of two pattern
trucks at the time of the incident. The
CO also testified that he did not know the location of his alleged non-Ford
pattern truck with a TMA at the time of the incident. (Tr. 277).
[58] The
Court has found Ruof’s diagram to be unreliable to the extent that it depicts a
pattern truck with a TMA parked alongside Detective Barton and Officer Roeder
close to the worksite. Barton and Roeder
were parked eight tenths of a mile east of the worksite at the South Keim
Street onramp.
[59] The PA Pub. 213 states: “C-1. Cones shall only be used during short-term operations.” Ruof understood that a “short-term operation” meant a work shift. (Tr. 141-42; Ex. 10, at 000302). PA Pub. 213 defines “Short-Term Stationary Operation” as “[a]n operation that will occupy a location for up to 24 hours. …” (Ex. 10 at 000310).
[60] Schaeffer identified Allison as “basically the boss on the job.” (Tr. 155).
[61] Superintendent Schaeffer used the term “bridge” instead of “overpass” while testifying, and later clarified that he meant an “overpass” over Route 100. (Tr. 159). Schaeffer marked it as “G” on Exhibit 1. (Tr. 160; Ex. 1).
[62] Schaeffer explained that he determined the length of the taper by using the station markers 220 and 215. (Tr. 168-69; Ex. 14). He explained that 220 “is actually 22,000,” and 215 “would be 21,500,” so that the distance between the two markers 22,000 and 21,500 is 500 feet. (Tr. 168-69). Schaeffer testified that he used the surveyor’s station markers as “reference” points, and that “there’s no way that that paint mark would have went out there and been very much shy of 600 and some off feet, because PennDOT inspectors are not going to allow me to do that, because of the liability and everything else.” (Tr. 200). He agreed that the marks he painted for the taper were the “full 600 and 60 some feet” because he started “between those two (the 220 and 215 markers), but you went for a full 660[.]” (Tr. 168-69, 200).
[63] Exhibit 14 includes notes that state “BEGIN SHOULDER TAPER 220’ IN ADVANCE OF MERGING TAPER WITH CHANNELIZING DEVICES (6 MIN.)” and “BEGIN 663’ MERGE TAPER” just east of station number 220 and “END 663’ MERGE TAPER” at “E” just west of station number 215. (Tr. 197; Ex. 14).
[64] Superintendent Schaeffer testified that the advance notice signs for the construction site were already in place “easily” two to three weeks before the day of the incident. (Tr. 167). These signs included “the two mile advance, the one mile advance, the half mile…the work areas signs.” (Tr. 167).
[65] Schaeffer testified that the shoulder was 12 feet wide “in some places.” (Tr. 174).
[66] Schaeffer later identified the taper line on the drawing at Exhibit 14 where there is an arrow pointing downward from “R 3800”. He said that his markings complied with the drawing “almost exactly to what they have here” [Ex. 14] “a foot or two one way or the other.” (Tr. 209-10; Ex. 14).
[67] Schaeffer also testified that during this time workers also “eradicated” the lines on the worksite, but he believes that that work did not require cones because the workers would have performed that task from a work truck, with a couple vehicles trailing behind it with flashing lights. (Tr. 184).
[68] Schaeffer testified that about an hour before the decedent was struck, he saw that the cones were so tight he “had to slow down substantially to get in the cones and pull up to the decedent, who was sitting at the end of the taper.” (Tr. 201).
[69] Schaeffer testified that the decedent was 400-500 feet away from him at the time; within sight distance but not easy listening distance. (Tr. 202).
[70] Schaeffer testified that he had earlier in the day asked Gardner to go home during the day while Schaeffer did the layout – the “start and stops of the tapers, of the end of the barriers, where the arrow board has to be placed. And so on and so forth.” (Tr. 152-53).
[71] This testimony is consistent with Detective Barton’s testimony that he was parked in the dead lane after he did the first “slow roll,” about an hour before the incident, and before he departed the dead lane to get in position at the South Keim Street ramp to perform the “loop around” for the second “slow roll.”
[72] Schaeffer testified that PA Pub. 213 applied to the permanent TCP and the crosshatched work zone area that Ruof had identified with an “A” on the TCP drawing. (Tr. 204-05; Ex. 14).
[73] Schaeffer identified “panelizers” as delineators with slash marks. (Tr. 196).
[74] Schaeffer marked the “End 663’ Merger Taper” shown on exhibit 14 with a “D” instead of an “E” as instructed by counsel. The letter “D” having already been used to identify the “40’ Typical” on the same drawing, the Court will refer to the “End 663’ Merger Taper” as having been marked with the letter “E” to avoid confusion. (Tr. 196-97; Ex. 14). The Court notes that the letters “B” and “F” were not used to mark any location on Exhibit 14.
[75] This testimony contradicts Ruof’s diagram to the extent it shows a pattern truck parked alongside a police car east of the traffic control zone. The evidence shows that at the time of the incident there were only two police cars parked at the South Keim Street onramp; one operated by Detective Barton and the other by Officer Roeder. (Ex. 18 at 21).
[76] Barton started the “slow roll” to set out the pattern for the first instance at 9:00 p.m. By then all of the signs regarding the work area, speed limit, and lane merger were installed and in place. (Tr. 341-42).
[77] There, Barton was about eight-tenths of a mile east and away from the traffic control pattern. (Tr. 305). He does not know where the Ford pattern truck with a TMA was located when he relocated from the traffic control zone to the South Keim Street ramp. (Tr. 307).
[78] Officer Parfeniouk’s police car was equipped with an onboard camera system. (Tr. 309; Ex. 13).
[79] Barton testified that when he first saw the cones, the cones were set up correctly “in a pattern forming a closure of the left lane and travel lane being the right lane.” He did not have any safety concerns about the cones. He said at 9:15 p.m., December 3, 2014, the cones were spaced “and appeared to be along the skip line from the taper out west to the Stowe exit.” (Tr. 358). He said that, after the incident, the cones from the taper to the incident were not in the same condition as he saw them at 9:15 p.m. Cones had been moved, possibly several times. (Tr. 359-60).
[80] Garber’s personally hand written signed statement from the interview states: “[w]ent to help reset cones to start painting, was setting cone from 3’ off skip mark to 1 ½’ to 2’ off skip mark on median side lane, looked to next cone + saw [decedent] setting it, saw headlights on both sides of [decedent], yelled to watch out + saw him go up on hood + fold, car carried him on hood until he stopped, [decedent] slid off hood + down roadway….” (Tr. 363; Ex. F at 1, 5). A photograph showing two short white lines in the middle of the road, spray painted by hand over the chain, to be used as a reference by the painters when later painting the paint line is at Exhibits E at 3 at “C”, E at 5 at “A”.
[81] Garber sustained a significant scrape and bleed across his shin. (Tr. 322).
[82] Gardner’s written statement from the interview states: “I looked up and saw [decedent] moving cones over with his back to traffic a dark blue SUV was coming out of our pattern while trying to exit he struck [decedent] from behind knocking him to the ground.” (Ex. F at 2).
[83] Respondent argues that the MUTCD does not apply to its line-painting activities performed in preparation for the setup of a temporary traffic control zone. (Resp’t. Br. at 22-23).
[84] Later, when being cross examined by the Secretary’s counsel, Wittlinger testified that Pennsylvania Typical Application (PATA) 503 required the use of a minimum of 15 cones in the taper at the worksite. He counted at least 11 cones in the taper shown in the top photograph at Exhibit 3 at 1. He could not say whether or not there were up to four more present in the taper from this photograph. (Tr. 434; Ex. 10 at 000488-89). In any event, the Secretary has not made the spacing between the diagonal cones of the taper an issue in this case. Only the length of the taper is at issue. (Tr. 441). The Court notes that the “Note” below the Distance and Spacing Quick Reference Chart states that “Channelizing devices used in taper shall be equally spaced at ½ D Max.”, where D for the 40 MPH speed is shown as 80 feet and one-half of D is 40 feet.
[85] Wittlinger testified that the distance between the two cones shown on the straightaway at “G” and “H”, Ex. E at 4, in the vicinity where the decedent was struck was 60 feet. (Tr. 423-24; Ex. E at 4).
[86] General Notes – Section C, Traffic Control Devices – Channelizing Devices (Page 1 of 1) states (in part):
C-1. Cones shall only be used during short-term operations. …
C-3. Channelizing devices [including cones] may be substituted for temporary longitudinal edge line pavement markings shown on any PATA 200 or 500 series [Long-Term Stationary Operations] drawing. If channelizing devices are used in place of longitudinal edge lines, they shall be spaced at a distance (in feet) equal to the regulatory speed limit; for example a 45 MPH speed limit requires 45’ spacing. …
C-5. Tapers within a lane shall utilize a minimum of 6 channelizing devices, however, more may be required based upon the regulatory speed limit and lane width. …
(Ex. 10 at 000302).
[87] Wittlinger was also questioned regarding the spacing of the cones within the transition taper. (Tr. 419; 432-436). The Court notes that this questioning began by attempting to use the spacing of the cones as a measuring device to determine the length of the transition taper; however, the testimony attempted to decipher the exact spacing of the cones in the transition taper. The Court notes that the exact spacing of the cones in the transition taper is not at issue for the citation items in this case.
[88] Conversely, the Secretary has failed to show that at the time of the incident Respondent had not: a) placed cones at 40-foot intervals along the straightaway and b) established a transition taper that was less than about 300 feet in length.
[89] Respondent devotes much of its Post-Hearing Brief to
the underlying premise that the OSHA citation at issue in this case depends on
how Respondent’s worksite is characterized.
For instance, Respondent claims that the citation items cannot be
affirmed here because Respondent’s worksite was “temporary” in nature, and not
“permanent;” that its work on the day of the incident was “preparatory,” and
not “actual work.” (Resp’t Br. at 14-15,
23-24). The Secretary argues that the
Court should reject this premise, stating simply that Respondent “was not
setting up a temporary traffic control zone” because “all four elements of a
temporary traffic control zone as described in the MUTCD” were already in place
on the night of the incident, and such traffic control zone “violated several
safety requirements.” (Sec’y Br. at 16).
The Court is not persuaded by Respondent’s argument regarding the “temporary” nature of its worksite. The worksite on December 3, 2014, may not have been as “permanent” as a worksite with concrete Jersey barriers and a long-term traffic flow pattern, but this does not negate Respondent’s obligations under the OSH Act to provide a safe working environment. Respondent still owed its workers protection from hazards on its worksite consistent with the general duty clause and applicable OSHA standards, regardless of the worksite’s “temporary” nature. The Court, however, as discussed herein, vacates these citation items because the Secretary has not shown that the alleged hazard is covered by the OSH Act, as defined by Commission precedent, and because the Secretary has not shown that the cited standards are applicable to, or not met by, Respondent.
[90] The Secretary has put forth no evidence attempting to
show that the traffic cones in this case, weighing twelve to twenty pounds and
standing thirty inches in height, could physically prevent a vehicle like a
Jeep Liberty from veering into the work zone.
(Tr. 128-29).
[91] Messrs. Ruof, Schaeffer, and Barton testified that the cones were in a configuration after the incident that differed from their configuration before the incident. (Tr. 89-102, 118-19, 216-23, 310-14, 351-58).
[92] Much testimony in the record attempted to calculate the spacing of the cones if they were placed “every third skip,” meaning every third dash line. Synthesized, the testimony would indicate that cones placed “every third skip” would be 120 feet apart (i.e., if each dashed line were 10 feet long, and each space between each dash line were 30 feet long, then a cone placed on the third dash line would be 120 feet away from the neighboring cone), according to the Secretary. (Tr. 256-57). Wittlinger testified that PA Pub. 213 indicated that the cones in the straightaway should be 80 feet apart and not 40 feet as alleged by the Secretary. He further testified that the photographs show that the cones in the straightaway were 80 feet apart. (Tr. 413-30; Exs. 10 at 000302, 000488-89, E).
[93] The Court notes that Ruof was recently pulled off his other project to work on this project and expressed unfamiliarity with the specifics of this project in his testimony at times. See, e.g, Tr. 109. Even the Secretary concedes that Ruof’s testimony regarding the distance of these cones was at times unreasonable. (Sec’y Br. at 16-17 citing Tr. 138). Ruof testified that the cones were 40 feet apart “thereabout” in the straightaway and that he did not agree with OSHA’s allegation that the transition taper was only about 120 feet in length. He also said “I’m not sure what they are. [The cones in the straightaway were] “[p]robably 20 feet apart or something like that.” (Tr. 131-38).
[94] Presumably, the Secretary seeks to establish that the cones were at least 120 feet apart because Safety Director Wittlinger testified that he agreed that if the cones were spaced at 120 feet apart, it would be inappropriate. (Tr. 431). The Court notes that the Secretary points out that Wittlinger testified that he thought the cones were 80 feet apart. (Sec’y Br. at 10 n.2 citing Tr. 423). For that testimony, however, Wittlinger was referring to post-accident evidence including the video in Ex. 13 and pictures that he took after the incident occurred. (Tr. 416-24 citing Ex. E).
[95] The Secretary did not offer any testimony that there has been an instance of an injury to a worker caused by an employer’s failure to place cones at 40-foot intervals.
[96] PA Pub. 213 defines “Activity Area” as the “Area of a temporary traffic control zone comprised of the buffer space and the work space usually separated from traffic flow by channelizing devices or barrier located parallel to the travel lanes.” (Ex. 10 at 000309).
[97] The decedent was wearing a fluorescent green jacket, in good condition, with silver reflective striping on chest, back and sleeves; a hardhat with a light was found nearby. (Ex. 18 at 17).
[98] At trial, counsel for the Secretary seemed to suggest that the “required” provision of PA Pub. 213 was based on the clauses within Respondent’s contract with the Commonwealth of Pennsylvania requiring Respondent to follow PA Pub. 213 and the MUTCD. (Tr. 115). For this case, the Court treats Respondent’s contract as another publication by a third-party organization, with regard to defining a hazard in a general duty clauses analysis. A contract may possibly serve to support recognition of a hazard by an employer, but for the same reasons in Indus. Glass, 15 BNA OSHC at 1603, it cannot be used to establish a hazard here.
[99] This is borne out by the following testimony by Ruof:
Q Okay. So this 40 foot requirement are you saying that only applies to the diagonal cones and not the ones that are on the skips?
A That I don’t know, ma’am.
(Tr. 137).
[100] Officer Deichert recorded Marable told him that “it seemed like someone didn’t put the cones down straight, and that caused him to really start paying attention.” Marable further told Officer Deichert “that the cones weren’t on the dotted line, as if they were haphazardly put down.” (Ex. 18 at 15). Marable said nothing about the cones being spaced too far apart.
[101] “Barricade” means “an obstruction to deter the passage of persons or vehicles.” 29 C.F.R. § 1926.203(a).
[102] Although the contract states that PA Pub. 213 applies
to Respondent and PA Pub. 213 states it has precedence over information found
in the MUTCD, the standard at 29 C.F.R. § 1926.202 incorporates MUTCD, and
not PA Pub. 213. For the purpose of
establishing a violation of the cited standard, the Court finds as a matter of
law that the provisions of the MUTCD take precedence over PA Pub. 213. Federal regulations that call for the
application of the MUTCD take precedence over any contract provision that
states PA Pub. 213 takes precedence over the MUTCD. Cent. of
Ga. R.R. Co. v. OSHRC, 576 F.2d 620, 625 (5th Cir. 1978) (“We
stress that the Act, not the contract, is the source of [the employer’s]
responsibilities.”) citing Frohlick Crane
Serv., Inc. v. OSHRC, 521 F.2d 628, 631 (10th Cir. 1975); see also Bianchi Trison Corp. v. Chao,
409 F.3d 196, 209 (3d Cir. 2005) (“The Commission previously had held that a
company cannot evade its safety and health responsibilities to its workers
simply by contracting away the responsibilities mandated under the OSH Act.”). Here, the MUTCD does not require an employer
to use trucks as protective vehicles to protect
workers or equipment from errant vehicles or TMAs capable of absorbing the
impact of errant vehicles to reduce the severity of rear-end crashes. See 29
C.F.R. § 1926.6(a) (only the mandatory provisions of the MUTCD are adopted as a
standard under the OSH Act); (Tr. 397-98; Ex. 11 at 21). This takes precedence over any PA Pub. 213
provision to the contrary. See U.S. ex rel. Roby v. The Boeing Co.,73
F.Supp. 2d 897, 910 (S.D. Ohio, 1999) (contract clause no defense to alleged
statutory violation).
[103] PA Pub. 213 also does not mandate the use of TMAs when installing or removing traffic control setups. PA Pub. 213, Section F-2. Guidelines for installation and removal of traffic control setups, states: “A shadow vehicle may be placed between approaching traffic and the workers who are installing channelizing devices.” (Ex. 10 at 000306). PA Pub. 213 defines a “Shadow vehicle” as:
A vehicle positioned within the activity in advance of the work space and work vehicles. The primary purpose of the shadow vehicle is to provide advance information to approaching drivers while protecting workers and work vehicles. Any vehicle can be used as a shadow vehicle as long as it is equipped with a flashing, oscillating, or revolving yellow light which is visible from any direction (360° visibility) and is not being used as a work vehicle. The yellow light must be activated within an active work zone. (emphasis added).
(Ex. 10 at 000309).
Here, the Ford Truck with an attached TMA was being used as a “work vehicle” carrying cones.
[104] The Secretary admits that the MUTCD does not require an employer to use trucks with TMAs as barricades to protect from errant vehicles. Instead, he asserts that where an employer chooses to employ such barricades, the MUTCD mandates trucks with TMAs be used correctly. (Sec’y Br. at 11-12). The Secretary’s assertion is incorrect for the reasons stated above.
[105] As noted above, the presence of a second truck with a TMA at the worksite on December 3, 2014 was difficult to discern for even CO Santiago during his investigation. The Court has found that the Secretary has not shown that there was a second truck with a TMA at the worksite that evening. The Court has further found that the Secretary has failed to prove that any such second truck with a TMA had “no other function at the Worksite other than as a barricade” as alleged in his brief. (Sec’y Br. at 12). CO Santiago testified that the Ford pattern truck with a TMA, driven by Villasenor, was not functioning as a TMA because it was engaged in deploying cones and was “doing the loop around. So it was not used to protect the workers who are actively moving cones.” (Tr. 371). There was no second truck with a TMA located in the pattern of the worksite at the time of the incident acting solely as a barricade, or otherwise.
[106] As discussed before, the Court has found no such truck with a TMA was present in the work zone pattern at the time of the incident.
[107] Even if there was a second truck with an attached TMA at the worksite that evening, there is no evidence that any such truck was being used as a TMA.
[108] This excludes any protection that may have been be afforded to any occupant of the Ford pattern truck with its attached TMA that may have been deployed when the Ford truck was doing a “loop around” or “slow roll.”
[109] When attempting to ascertain distances between cones in the taper, CO Santiago testified that he “felt more comfortable” using the video from Officer Hollis’s patrol car at Exhibit A rather than using the video from Officer’s Parfeniouk patrol car (Ex. 13) because a vehicle in Officer Parfeniouk’s video was “sort of obstructing the view.” (Tr. 388).
[110] Wittlinger actually said that he did not know why the
taper was only 160 feet long. (Tr.
421). As previously
explained, the Court gives little or no weight to CO
Santiago’s courtroom calculation that the
taper was 160 feet long. (Tr. 388-96; Exs. 3 at 2 [bottom photograph], 13, A).
[111] Exhibit 14 includes notes that state “BEGIN SHOULDER TAPER 220’ IN ADVANCE OF MERGING TAPER WITH CHANNELIZING DEVICES (6 MIN.)” and “BEGIN 663’ MERGE TAPER” just east of station number 220 and “END 663’ MERGE TAPER” at “E” just west of station number 215. (Tr. 197; Ex. 14).